Inspections for the day of: Wednesday, August 31, 2016.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-02822 BLD-Footing8/31/20168/31/20168/31/2016 4:34:07 PMPPASS
Sean Phone #: ###-####
BLD16-02109 BLD-Final8/31/20168/31/20168/31/2016 3:44:57 PMPPASS
Tom Phone #: ###-####
BLD16-02109 DOC - Permit Finaled8/31/20168/31/20168/31/2016 3:44:48 PMPPASS
BLD16-02369 BLD-Energy code compliance8/30/20168/31/20168/31/2016 3:03:55 PMPNR
Insulation, as late as possible // Bob Phone #: ###-####
ESC15-00720 Site Final8/31/20168/31/20168/31/2016 2:55:26 PMPDONE
ESC15-00720 DOC - Permit Finaled8/31/20168/31/20168/31/2016 2:55:18 PMPPASS
BLD15-01921 BLD-Final8/31/20168/31/20168/31/2016 2:54:58 PMPPASS
Late PM Phone #: ###-####. Ok for perm occ.
BLD16-01919 BLD-Framing/Rough-in8/31/20168/31/20168/31/2016 2:47:41 PMPPASS
randy Phone #: ###-####. Interior steel stud framed walls ok. Will need to patch and firecaulk all holes and penetrations in firewalls.
BLD16-02361 BLD-Framing/Rough-in8/31/20168/31/20168/31/2016 2:16:24 PMPNR
If you call 20 in advance I can meet you there Phone #: ###-#### Inspection requested via web by Andy Thompson. Needs plumbing permit and rough in inspection.
BLD16-00628 BLD-Ceiling Grid Inspection8/31/20168/31/20168/31/2016 2:03:24 PMPPASS
Brad Turk Phone #: ###-#### Inspection requested via web by Brad Turk
ESC16-01136 Site Preparation8/31/20168/31/20168/31/2016 1:30:52 PMPPASS
BLD16-02975 BLD-Footing8/31/20168/31/20168/31/2016 1:30:16 PMPPASS
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD16-02890 BLD-Final8/30/20168/31/20168/31/2016 12:58:54 PMPNR
Doug Phone #: ###-####-please call 1 hour prior to meet. Fire/life/safety failed.
MIS16-00038 BLD-Conference8/24/20168/31/20168/31/2016 11:02:57 AMADONE
Status check. Issue 25 day notice if no progress has been made. Plans have been submitted as of8-30 for review.
BLD16-02263 BLD-Final8/30/20168/31/20168/31/2016 10:31:22 AMAPASS
Bob Phone #: ###-####. Ok for perm occ.
BLD16-01801 BLD-Framing/Rough-in8/30/20168/31/20168/31/2016 10:14:21 AMAPASS
Gerry Phone #: ###-####// ###-####
BLD16-00647 BLD-Framing/Rough-in8/30/20168/31/20168/31/2016 9:25:24 AMAPASS
Santiogo Phone #: ###-####. Interior steel stud framed walls and hardlid ok. Noted that fire sprinkler work not started.
BLD16-00858 BLD-Final8/30/20168/31/20168/31/2016 9:07:22 AMAFAIL
Todd Phone #: ###-####. Provide tempered glazing in windows on either side of exterior door to patio in masterbedroom. A smoke detector and CO detector required in hall way outside of sleeping rooms. All detectors must be hardwired and interconnected. Provide the blower door test result and post or the 3rd. party airseal inspection report. A correction notice has been issued.
BLD16-02369 BLD-Framing/Rough-in8/30/20168/31/20168/31/2016 8:22:46 AMAFAIL
Bob Phone #: ###-####. Complete lateral bracing on A3, A6, A7E trusses. Missed interior bearing point on A5 truss. Correction notice posted. ok to insulate.