Inspections for the day of: Thursday, August 31, 2017.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00390 INSP-Final Inspection8/30/20178/31/20178/31/2017 3:14:39 PMAFAIL
There is an audible sync problem that needs addressed. As-builts are required for all of the changes

Matt Phone #: ###-####
BLD16-02809 FIRE-Final Inspection8/31/20178/31/20178/31/2017 3:12:30 PMPCANC
BLD16-02809 FIRE-Final Inspection8/31/20178/31/20178/31/2017 3:11:48 PMPPASS
Life safety passed
FIR16-00608 INSP-Sprinkler Rough-in8/31/20178/31/20178/31/2017 2:11:59 PMPPASS
Permit finaled
FIR17-00302 INSP-Sprinkler Rough-in/Hydro8/31/20178/31/20178/31/2017 2:10:25 PMPPASS
Underground hydro test passed
BLD17-01518 FIRE-Final Inspection8/31/20178/31/20178/31/2017 2:09:20 PMPPASS
Life safety passed
FIR17-00369 INSP-Final Inspection8/31/20178/31/20178/31/2017 11:34:37 AMPPASS
Permit finaled
BLD17-00442 FIRE-Final Inspection8/31/20178/31/20178/31/2017 11:33:14 AMPPASS
Life safety passed. Fire hydrant location is acceptable.

Lorin Phone #: ###-####
BLD17-01315 FIRE-Conference8/30/20178/31/20178/31/2017 11:32:20 AMADONE
Able and I discussed the placement of fire extinguishers, exit signs and emergency lights Phone #: ###-####
FIR17-00504 INSP-Sprinkler Rough-in8/30/20178/31/20178/31/2017 11:30:36 AMAPASS
Underground supply piping ok to cover from the riser to the point of connection which is about 30' out.
FIR17-00365 INSP-Sprinkler Rough-in/Hydro8/31/20178/31/20178/31/2017 7:36:23 AMPCANC
Contact Brad Westbrook ###-#### 30 min prior to UG Hydro insp start please.

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank