Inspections for the day of: Friday, August 4, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00922 BLD-Final8/3/20008/4/20008/4/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/03/2000 at 08:39:58. Contact: ###-####. l/c isued 8/4/2000 9:05:51 AM
BLD00-00369 BLD-Final8/3/20008/4/20008/4/2000 12:00:00 AMAFAIL
jeff ###-#### fn occ ok pending ele final. 8/4/2000 10:46:21 AM
BLD99-02185 BLD-Foundation8/3/20008/4/20008/4/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/03/2000 at 12:52:53. Contact: ###-####. rebar ok south wall line at loading docl/ walked roof joist and girder to colum atchaments ok steel deck atachments changed to hilti shot pins requir enginer of record to submit change. east deck 4 bays to the west ok pending aproval of resubmital 8/4/2000 10:33:04 AM
BLD00-00886 BLD-Final8/3/20008/4/20008/4/2000 12:00:00 AMAFAIL
rob ###-#### fn occ pending ele final. 8/4/2000 8:52:50 AM
BLD99-02807 BLD-Framing/Rough-in8/4/20008/4/20008/4/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/04/2000 at 07:13:07. Contact: ###-####.
BLD00-01485 BLD-Framing/Rough-in8/4/20008/4/20008/4/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/04/2000 at 07:27:18. Contact: ###-####.
BLD00-01636 BLD-Framing/Rough-in8/4/20008/4/20008/4/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/04/2000 at 09:19:53. Contact: ###-####. no ele or mech approvals. 8/4/2000 3:32:01 PM
BLD00-01692 BLD-Framing/Rough-in8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/04/2000 at 09:36:45. Contact: ###-####. sheer wall c/n 8/4/2000 3:44:59 PM
BLD00-01466 BLD-Final8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/04/2000 at 09:47:46. Contact: ###-####.