Inspections for the day of: Friday, August 4, 2000.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-02740 Sprinkler (Final)8/3/20008/4/20008/4/2000 12:00:00 AMAPART
###-#### tie in ok pvb too low 8/4/2000 4:20:51 PM
PLM00-02741 Water and/or Sewer8/3/20008/4/20008/4/2000 12:00:00 AMAPASS
###-####
PLM00-02742 Water and/or Sewer8/3/20008/4/20008/4/2000 12:00:00 AMAPASS
###-####
PLM00-01621 Water and/or Sewer8/3/20008/4/20008/4/2000 12:00:00 AMAPART
###-#### s/w ok replace electrical conduit on exterior pumped subsurface drain with approved materials 8/4/2000 4:18:56 PM
PLM00-02750 Plumbing Rough-in8/3/20008/4/20008/4/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/03/2000 at 15:30:11. Contact: ###-####. did this one 8/3/00 pm 8/4/2000 4:22:23 PM
PLM00-01644 Groundwork8/4/20008/4/20008/4/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/04/2000 at 08:26:48. Contact: ###-####.
PLM00-01853 Final8/4/20008/4/20008/4/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/04/2000 at 09:25:20. Contact: ###-####. test fire dcva, remove black nip from fire dcva 8/7/2000 7:58:19 AM
PLM00-01854 Final8/4/20008/4/20008/4/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/04/2000 at 09:27:21. Contact: ###-####. test fire dcva, remove black nip from fire dcva 8/7/2000 7:57:40 AM
PLM00-01856 Final8/4/20008/4/20008/4/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/04/2000 at 09:28:31. Contact: ###-####. test fire dcva, remove blavk nip from fire dcva 8/7/2000 7:56:49 AM
PLM00-02759 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
keith ###-#### w/s final
PLM00-01919 Final8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 final ok
PLM99-03862 Final8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 final ok
PLM99-03905 Final8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 final ok
PLM00-02718 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM00-02682 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM00-02616 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM00-02550 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM00-02521 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM00-02437 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM00-02375 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM00-02392 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM00-01621 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 material replacement ok on partial pumped subsurface drain
PLM00-02740 Sprinkler (Final)8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000
PLM00-02273 Water and/or Sewer8/4/20008/4/20008/4/2000 12:00:00 AMPPASS
Added by Inspector: 330 On 8/4/2000 map
PLM99-03767 Plumbing Rough-in8/3/20008/4/20008/4/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/03/2000 at 13:46:34. Contact: ###-####. ri ok with tub trap arms hung 8/4/2000 4:22:52 PM