Inspections for the day of: Monday, August 4, 2008.
Number of inspections: 30
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-01672 Final8/4/20088/4/20088/4/2008 3:55:09 PMPPASS
Phone #: ###-#### Internet Inspection Request from: HARVEY REYNA ok to final, see added ri, no card to sign
ELE08-02146 Rough-In Permanent Service8/1/20088/4/20088/4/2008 3:51:52 PMAPASS
Panel TPD Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok meter installed from before, p/s exst meter pak n ok, no esc this project
ESC07-01172 General Inspection8/4/20088/4/20088/4/2008 3:31:46 PMPPART
looked ok
ESC08-00295 General Inspection8/4/20088/4/20088/4/2008 3:30:59 PMPPART
looked ok
ESC08-00113 General Inspection8/4/20088/4/20088/4/2008 3:30:13 PMAPART
looked ok
ESC07-01326 General Inspection8/4/20088/4/20088/4/2008 3:29:32 PMAPART
looked ok
ESC08-00415 General Inspection8/4/20088/4/20088/4/2008 3:28:33 PMAPART
looked ok
ELE08-01672 Electrical Rough-In8/4/20088/4/20088/4/2008 3:27:00 PMPPASS
Phone #: ###-#### Internet Inspection Request from: HARVEY REYNA ri ok
ELE08-02133 Electrical Rough-In8/4/20088/4/20088/4/2008 2:58:00 PMPPASS
Contact: Steve Leal - please call before going. Phone #: ###-#### Internet Inspection Request from: Deb Gooden walls ok to cover, no esc this project
ELE08-02156 Permanent Service8/4/20088/4/20088/4/2008 2:02:42 PMPPASS
Phone #: ###-#### Internet Inspection Request from: Dan Surerus p/s u/g n ok, 1 meter only (house), talked to contractor
ELE08-02161 Final8/4/20088/4/20088/4/2008 1:14:28 PMPPASS
Call Stu for room numbers. Phone #: ###-#### Internet Inspection Request from: Stuart Welton ok to final, no esc this project, no card to sign
ELE07-01164 Final8/4/20088/4/20088/4/2008 12:23:21 PMPPASS
Sharleen Phone #: ###-#### corrections done this permit, ok to final, no esc this project
ELE07-03623 Electrical Rough-In8/1/20088/4/20088/4/2008 10:54:40 AMACANC
Doc Phone #: ###-#### see p/s, wrong type request
ELE07-03623 Permanent Service8/4/20088/4/20088/4/2008 10:38:13 AMAPASS
Doc Phone #: ###-#### p/s o/h rec ok
ELE08-01922 Electrical Rough-In8/1/20088/4/20088/4/2008 10:07:26 AMAPASS
Jene Phone #: ###-#### ok to cover concrete encased electrode, ok to cover garage, no esc this project
ELE08-01922 Permanent Service8/4/20088/4/20088/4/2008 10:04:25 AMAPASS
Jene Phone #: ###-#### p/s o/h n ok, no esc this project
ELE08-02150 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:29:50 AMAPASS
Panel TPH Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, meter installed from before, p/s exst meter pak n ok, no esc this project
ELE08-02149 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:29:00 AMAPASS
Panel TPG
Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, meter installed from before, p/s exst meter pak n ok, no esc this project
ELE08-02148 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:27:54 AMAPASS
Panel TPF Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, meter installed from before, p/s exst meter pa n ok, no esc this project
ELE08-02147 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:27:01 AMAPASS
Panel TPE Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, meter installed from before, p/s exst meter pak n ok, no esc this project
ELE08-02145 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:25:07 AMAPASS
Panel TPC Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok meter installed fom before, p/s exst meter pak n ok, no esc this project
ELE08-02144 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:24:08 AMAPASS
Panel TPB Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, meter installed from before, p/s exst meter pak n ok, no esc this project
ELE08-02143 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:23:05 AMAPASS
Panel TPA Phone #: ###-#### Internet Inspection Request from: Don Lustig ric ok p/s exst meter pak (meter installed from before) no esc this project
ELE08-02152 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:22:05 AMAPASS
Panel TPK Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, p/s exst meter pak pk n ok, no esc this project
ELE08-02151 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:21:14 AMAPASS
Panel TPJ Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, p/s exst meter pak n ok, no esc this project
ELE08-02155 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:20:29 AMAPASS
Panel TPN Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, p/s exst meter pak n ok, no esc this project
ELE08-02154 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:19:35 AMAPASS
Panel TPM Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, p/s exst meter pak n ok, no esc this project
ELE08-02153 Rough-In Permanent Service8/1/20088/4/20088/4/2008 9:18:42 AMAPASS
Panel TPL Phone #: ###-#### Internet Inspection Request from: Don Lustig ri ok, p/s exst meter pak n ok, no esc this project
ELE08-01567 Final8/3/20088/4/20088/4/2008 8:41:56 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Lynn Cable called, left correction notice, NEC 408.4 shall provide panel schedules that are clear, concise, and explanatory at pool equipment and main panel, 352.30(A) rnc shall be securely fastened within 3' of box or conduit termination, 680.22(A)(3) shall provide receptacle within 10' min or 20' maximum from inside pool wall, 110.12(C) there shall be no broken parts(top of pull box),110.14 all bonding connections shall be tight
ELE08-01278 Final8/3/20088/4/20088/4/2008 8:04:24 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Lynn Cable called, left correction notice, NRC 210.52(C)(1) shall provide receptacle in wall counter space such that no point is over 24" from outlet, 210.52(A) shall provide receptacle in 2' wall space in bonus room and at top of stairs, 210.70(A)(3) shall provide lighting outlet for downstairs panel