ESC08-00140
| Random Inspection | 8/4/2008 | 8/4/2008 | 8/4/2008 5:07:31 PM | P | PASS |
|
|
ESC permit sign posted, All BMP's in place. trackout ok.
|
BLD08-00398
| BLD-Conference | 8/4/2008 | 8/4/2008 | 8/4/2008 5:07:00 PM | P | DONE |
|
|
|
BLD08-00418
| BLD-Footing | 8/4/2008 | 8/4/2008 | 8/4/2008 3:12:42 PM | P | NR |
|
|
Carl Phone #: ###-####
|
ESC08-00152
| General Inspection | 8/4/2008 | 8/4/2008 | 8/4/2008 3:12:23 PM | P | PASS |
|
|
ESC permit sighn posted. BMP's in place, noted ground wip on site. Track out is clean. Contractor does have dedicated enterance/exit point.
|
BLD08-01551
| BLD-Final | 8/4/2008 | 8/4/2008 | 8/4/2008 2:27:22 PM | P | PASS |
|
|
Cindy Phone #: ###-####
|
BLD08-01551
| DOC - Permit Finaled | 8/4/2008 | 8/4/2008 | 8/4/2008 2:27:13 PM | P | PASS |
|
|
|
ESC08-00279
| General Inspection | 8/4/2008 | 8/4/2008 | 8/4/2008 1:58:39 PM | P | PASS |
|
|
sign was posted. All bmps still in place. site was clean.
|
BLD08-00620
| BLD-Concrete | 8/4/2008 | 8/4/2008 | 8/4/2008 1:57:58 PM | P | CANC |
|
|
Eric- ceiling Phone #: ###-####
|
BLD08-00620
| BLD-Framing/Rough-in | 8/4/2008 | 8/4/2008 | 8/4/2008 1:57:52 PM | P | PART |
|
|
Eric- ceiling Phone #: ###-####. 1st. layer of 5/8 type x for floor ceiling assembly.
|
ESC07-01540
| BMP Violation | 8/4/2008 | 8/4/2008 | 8/4/2008 10:32:06 AM | A | FAIL |
|
|
Notified RP that track out is not being controled as should be. Noted that area needs to be swept at end of day or as needed to protect the two di's at enterance point. Gave RP 24hrs. to correct non conformance and will check back in the am tomorrow.
|
ESC08-00279
| Complaint Inspection | 8/4/2008 | 8/4/2008 | 8/4/2008 10:06:55 AM | P | CANC |
|
|
|
BLD08-01361
| BLD-Framing/Rough-in | 8/4/2008 | 8/4/2008 | 8/4/2008 10:04:21 AM | A | PASS |
|
|
interior framed walls ok.
|
BLD06-01238
| BLD-Final | 8/1/2008 | 8/4/2008 | 8/4/2008 9:30:22 AM | A | PASS |
|
|
David Phone #: ###-####
|