Inspections for the day of: Tuesday, August 4, 2009.
Number of inspections: 1
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00352 Conference8/4/20098/4/20098/4/2009 3:11:27 PMPDONE
2:30pm: Met with Wetlands & Boise Parks at 1:45; Discussions regarding USCOE 404 regarding wetlands as dewatering control. SGW was presented a copy of a clarification letter from G. Martinez (COE) which provided better defined perimeters regarding the dewatering into the wetlands. Walked the site and the discharges into the wetlands appears to be within the 404 conditions. No waters have appeared to have been discharged off site during the dewatering for the excavatio of the large stormwater basin at the east side of the project. At 2:30 met with prime contractors and government agencies, discussions and briefings were provided. Reps included ACHD, Brighton, Wetlands LLC, Boise City PDS (T. Records, Clint Smith & S. Webb) as well as Parks (Mike). Jay Walker (Brighton) requested a SWPPP overview at which time the letter from COE which contained the clarification regarding dewatering was summarized.