PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, August 4, 2009
.
Number of inspections:
8
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC07-00390
Aging Inspection
8/4/2009
8/4/2009
8/12/2009 4:36:45 PM
DONE
ESC08-00749
Site Final
7/28/2009
8/4/2009
8/6/2009 11:52:27 AM
A
FAIL
Could not Reach RP or the owner of the lot.
Lot is not stabilized per the accepted standards of the Boise City construction sire erosion and sediment Ordinance 8-17.
ESC09-00046
Site Preparation
8/4/2009
8/4/2009
8/4/2009 4:36:13 PM
PASS
ESC09-00278
Site Final
8/4/2009
8/4/2009
8/4/2009 4:33:36 PM
P
PASS
jamie Phone #: ###-####
ESC09-00478
Site Preparation
8/4/2009
8/4/2009
8/4/2009 3:27:42 PM
NR
ESC09-00352
Conference
8/4/2009
8/4/2009
8/4/2009 3:16:11 PM
P
DONE
ESC09-00352
General Inspection
7/30/2009
8/4/2009
8/4/2009 1:10:18 PM
A
PART
Inspection occured at 8:00 am thru 10:00 am.
Majority of the project and activities are in compliance. City is still questioning the activity of dewatering within the 17 acre wetland area. Per the SWPPP's that was reviewed that the have been authorized by the Army Corps of Engineer to discharge turbid water into the wetland area.
No discharges of any water, turbid or clean within into any area of the Boise River any other bodies of water.
ESC09-00407
Site Preparation
8/4/2009
8/4/2009
8/4/2009 12:58:37 PM
FAIL
Verbal to RP:
1. Install sediment protection along the front and back perimeter of lot.
2. Install proper storm drain inlet protection.
3. Post ESC sign at front of lot.
4. Provide a concrete washout prior to the pour of the footings.
Will re-inspect on 7/6/09AM.