ESC10-00519
| Conference | 8/4/2010 | 8/4/2010 | 8/4/2010 3:17:15 PM | P | DONE |
|
|
2:00 p.m: Reviewed stormwater drainage pond stabilization procedures and requirements with RP, J. Walker. Also, reviewed upcoming phase scope of work.
|
ESC09-00812
| General Inspection ESC | 8/4/2010 | 8/4/2010 | 8/4/2010 1:44:44 PM | | DONE |
|
|
Conference with J. Wylie (Boise City P. Works): Discussion took place regarding assisting with Public Works inspector in performing weekly inspection during upcoming project. Inspections will be performed by Inspector 460 or 420.
|
ESC10-00519
| Site Preparation | 8/2/2010 | 8/4/2010 | 8/4/2010 8:09:06 AM | P | CANC |
|
|
2pm: Conference not site preparation
|