FIR04-00634
| INSP-Conference | 7/27/2010 | 8/4/2010 | 8/11/2010 11:38:18 AM | A | DONE |
|
|
Follow up conference with Keith (head of maintenance), on site, for project status and he stated that ADT would be contacting me.
|
BLD10-01192
| FIRE-Final Inspection | 8/4/2010 | 8/4/2010 | 8/4/2010 3:55:23 PM | P | PASS |
|
|
Life safety passed.
|
FIR10-00238
| INSP-Sprinkler Rough-in/Hydro | 8/4/2010 | 8/4/2010 | 8/4/2010 3:08:56 PM | P | PASS |
|
|
The overhead hydro tests of both systems passed.
|
BLD10-01192
| FIRE-Alarm Testing | 8/4/2010 | 8/4/2010 | 8/4/2010 3:03:40 PM | P | PASS |
|
|
Remote stations installed and duct detector testing passed.
|
FIR10-00307
| INSP-Final Inspection | 8/4/2010 | 8/4/2010 | 8/4/2010 2:26:56 PM | P | FAIL |
|
|
The trouble signal from the fm200 panel was received at the facp as a supervisory. After that was changed we found that the signals were not being received correctly at the monitoring station. I stayed as long as possible but corrections could not be completed. Will need to be rescheduled.
|
BLD10-00780
| FIRE-Alarm Testing | 8/4/2010 | 8/4/2010 | 8/4/2010 2:25:08 PM | P | CANC |
|
|
The project related fire alarm and fm200 system permits are not finaled yet.
|
BLD10-00780
| FIRE-Final Inspection | 8/4/2010 | 8/4/2010 | 8/4/2010 2:24:44 PM | P | CANC |
|
|
The project related fire alarm and fm200 system permits are not finaled yet.
|
FIR10-00321
| INSP-Sprinkler Rough-in | 8/3/2010 | 8/4/2010 | 8/4/2010 2:23:51 PM | P | PASS |
|
|
All of the sprinkler piping is complete and can be covered except for the 1 1/4" main has not been installed or the new pendant head in front of the doorway.
|
FIR10-00262
| INSP-Sprinkler Rough-in/Hydro | 8/4/2010 | 8/4/2010 | 8/4/2010 1:03:30 PM | P | PASS |
|
|
The overhead hydro test passed.
|
BLD10-00114
| FIRE-Conference | 8/4/2010 | 8/4/2010 | 8/4/2010 11:32:27 AM | A | DONE |
|
|
Talked about relocation of planned exposed fire sprinkler lines in order to have them concealed. These changes need to be submitted to tim frost for approval. Also we discussed the combustible concealed space. There are two basic options which are fill the space entirely with non-combustible insulation or provide sprinkler protection. Also the fire sprinkler riser needs to be relocated out of the access door way to the riser room.
|
MIS10-00226
| FIR-Conference | 7/30/2010 | 8/4/2010 | | A | |
|
|
follow up inspection
|