Inspections for the day of: Wednesday, August 4, 2010.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00473 Site Preparation8/4/20108/4/20108/4/2010 4:22:29 PM PART
Verbal to RP:
Must provide a washout for the project. RP will make sure that it will inplace prior to any washing of any non stormwater pollutants.
ESC10-00023 General Inspection8/4/20108/4/20108/4/2010 3:45:19 PM DONE
ESC10-00023 DOC - Permit Finaled8/4/20108/4/20108/4/2010 3:45:13 PMPPASS
ESC10-00509 BMP Violation8/2/20108/4/20108/4/2010 3:44:54 PMPPASS
ESC10-00443 General Inspection8/4/20108/4/20108/4/2010 3:44:46 PMPFAIL
Verbal to RP. Must perovide scdiment barrier protection on both sides of the storm drain outlet to the BOise River.
ESC09-00470 General Inspection7/29/20108/4/20108/4/2010 3:43:45 PMADONE
Stockpile will be shaped into a berm. Told the RP of the developement if it is going to be inactive for over 14days, Must stabilize the stock piles.
ESC10-00519 Site Preparation8/2/20108/4/20108/4/2010 3:42:27 PMPPASS
All provisions have been aquired for the discharge within the wetland area. Utility work will be occuring within the next two weeks.
ESC09-00791 BMP Violation8/2/20108/4/20108/4/2010 10:36:04 AMAPASS
ESC07-00751 Aging Inspection8/4/20108/4/20108/4/2010 9:52:23 AM DONE
ESC10-00490 Site Preparation8/4/20108/4/20108/4/2010 9:44:53 AM PASS