PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, August 4, 2015
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC14-00487
General Inspection
8/4/2015
8/4/2015
8/5/2015 11:38:15 AM
PASS
Hillside vegetation requirements and stabilization met. ESC permit requirements satisfied. Hackberry Ranch DI bags will stay installed as next lot is vacant and ready for construction.
ESC15-00022
General Inspection
8/4/2015
8/4/2015
8/4/2015 4:26:24 PM
PASS
WIP. No violations at site. No corrections issued.
ESC15-00151
General Inspection
8/4/2015
8/4/2015
8/4/2015 3:38:46 PM
CANC
ESC14-00989
General Inspection
8/4/2015
8/4/2015
8/4/2015 2:58:23 PM
PASS
No activity at time of inspection. No trackout, dust, or discharges originating from site. Work for some retaining walls and preliminary foundation work has already started. No corrections issued.
ESC15-00023
General Inspection
8/3/2015
8/4/2015
8/4/2015 2:39:53 PM
A
PASS
WIP. Frame is up. Gatorguard wattle is installed, no trackout or discharges. Trash is contained. Site is in much better condition than it was in earlier phases. No corrections at this time.
ESC15-00035
General Inspection
8/4/2015
8/4/2015
8/4/2015 2:33:56 PM
P
PASS
Road and roundabouts are complete. Townhome lots on road shoulders have been graded and compacted. No discharges or other issues, temporary BMPs (silt fence) is installed.
No corrections issued. Will continue to monitor stabilization and removal or transfer of responsibility of temp BMPs.
ESC14-01187
Aging Inspection
8/4/2015
8/4/2015
8/4/2015 1:01:44 PM
PASS
Pierce Park Elementary sewer line rehab project is complete and stabilized. ESC permit conditions satisfied.
ESC14-01187
DOC - Permit Finaled
8/4/2015
8/4/2015
8/4/2015 1:01:03 PM
P
PASS
ESC15-00504
General Inspection
8/4/2015
8/4/2015
8/4/2015 11:18:29 AM
P
PASS
WIP at Kensington. Boise ESC permit sign and SWPPPs posted for Kensingtion at North Pointe, and North Pointe Retail. No trackout from construction exits, perimeter streets, gutters and sidewalks are clean.
Dewatering is in progress and is being pumped into a channel at east end of site that runs to a retention and filtering pond on the west end of site. Pumped water goes into a pipe that discharges into the canal at irrigation box on State Street.
No fugitive dust issues observed, water trucks and tanker are on site. RP-GC Barry with Bach Homes and conducted a walk through inspection.
No corrections at this time. Irrigation company is monitoring disharges.
Barry stated Knife River will be working on retail section and digging their own dewatering pond.
ESC15-00165
General Inspection
8/4/2015
8/4/2015
8/4/2015 10:22:30 AM
PASS
ESC15-00164
General Inspection
8/4/2015
8/4/2015
8/4/2015 9:01:52 AM
PASS
ESC15-00222
Aging Inspection
8/4/2015
8/4/2015
8/4/2015 8:36:44 AM
PASS
Foundation and framing for project are complete. No further earthwork and no sediment leaving site. ESC permit finaled.
ESC15-00222
DOC - Permit Finaled
8/4/2015
8/4/2015
8/4/2015 8:36:04 AM
P
PASS