Inspections for the day of: Tuesday, August 4, 2015.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00487 General Inspection8/4/20158/4/20158/5/2015 11:38:15 AM PASS
Hillside vegetation requirements and stabilization met. ESC permit requirements satisfied. Hackberry Ranch DI bags will stay installed as next lot is vacant and ready for construction.
ESC15-00022 General Inspection8/4/20158/4/20158/4/2015 4:26:24 PM PASS
WIP. No violations at site. No corrections issued.
ESC15-00151 General Inspection8/4/20158/4/20158/4/2015 3:38:46 PM CANC
ESC14-00989 General Inspection8/4/20158/4/20158/4/2015 2:58:23 PM PASS
No activity at time of inspection. No trackout, dust, or discharges originating from site. Work for some retaining walls and preliminary foundation work has already started. No corrections issued.
ESC15-00023 General Inspection8/3/20158/4/20158/4/2015 2:39:53 PMAPASS
WIP. Frame is up. Gatorguard wattle is installed, no trackout or discharges. Trash is contained. Site is in much better condition than it was in earlier phases. No corrections at this time.
ESC15-00035 General Inspection8/4/20158/4/20158/4/2015 2:33:56 PMPPASS
Road and roundabouts are complete. Townhome lots on road shoulders have been graded and compacted. No discharges or other issues, temporary BMPs (silt fence) is installed.

No corrections issued. Will continue to monitor stabilization and removal or transfer of responsibility of temp BMPs.
ESC14-01187 Aging Inspection8/4/20158/4/20158/4/2015 1:01:44 PM PASS
Pierce Park Elementary sewer line rehab project is complete and stabilized. ESC permit conditions satisfied.
ESC14-01187 DOC - Permit Finaled8/4/20158/4/20158/4/2015 1:01:03 PMPPASS
ESC15-00504 General Inspection8/4/20158/4/20158/4/2015 11:18:29 AMPPASS
WIP at Kensington. Boise ESC permit sign and SWPPPs posted for Kensingtion at North Pointe, and North Pointe Retail. No trackout from construction exits, perimeter streets, gutters and sidewalks are clean.

Dewatering is in progress and is being pumped into a channel at east end of site that runs to a retention and filtering pond on the west end of site. Pumped water goes into a pipe that discharges into the canal at irrigation box on State Street.

No fugitive dust issues observed, water trucks and tanker are on site. RP-GC Barry with Bach Homes and conducted a walk through inspection.

No corrections at this time. Irrigation company is monitoring disharges.

Barry stated Knife River will be working on retail section and digging their own dewatering pond.
ESC15-00165 General Inspection8/4/20158/4/20158/4/2015 10:22:30 AM PASS
ESC15-00164 General Inspection8/4/20158/4/20158/4/2015 9:01:52 AM PASS
ESC15-00222 Aging Inspection8/4/20158/4/20158/4/2015 8:36:44 AM PASS
Foundation and framing for project are complete. No further earthwork and no sediment leaving site. ESC permit finaled.
ESC15-00222 DOC - Permit Finaled8/4/20158/4/20158/4/2015 8:36:04 AMPPASS