Inspections for the day of: Thursday, August 4, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03620 BLD-Aging Inspection8/4/20168/4/20168/5/2016 10:23:43 AM PASS
MIS13-00269 MIS-Aging Inspection8/4/20168/4/20168/5/2016 10:23:07 AM PEND
MIS16-00139 MIS-Aging Inspection8/4/20168/4/20168/5/2016 10:22:44 AM DONE
BLD15-03012 BLD-Aging Inspection8/4/20168/4/20168/5/2016 10:22:13 AM PEND
BLD16-00741 BLD-Aging Inspection8/4/20168/4/20168/5/2016 10:21:41 AM PEND
BLD16-02021 BLD-Framing/Rough-in8/3/20168/4/20168/4/2016 4:34:12 PMPPART
John Phone #: ###-####,, c/n posted,, ok to insulate
BLD15-03925 BLD-Wall cover8/4/20168/4/20168/4/2016 4:18:46 PMPPASS
Charlie Phone #: ###-####
BLD16-02776 BLD-Framing/Rough-in8/4/20168/4/20168/4/2016 4:18:23 PMPPASS
Eric Phone #: ###-####
BLD16-02703 BLD-Foundation8/4/20168/4/20168/4/2016 3:51:51 PMPPASS
Adam Phone #: ###-####
BLD16-01789 BLD-Framing/Rough-in8/3/20168/4/20168/4/2016 1:16:36 PMAPART
Mitch Phone #: ###-####,, need to block between upper roof area I joists,, need to verify seal pack,, no windows in at this point,,, ok to insulate
MIS16-00237 BLD-Conference8/2/20168/4/20168/4/2016 1:14:58 PMAPEND
Possbily turning garage, 5888 Gary Lane, into an ADU without permits. Owner trying to get new trash account with UB. // status review////.. talked with owner,, said he is still in process of permit,, talking to Carl M. in plan review
BLD16-02191 BLD-Wall Bracing8/3/20168/4/20168/4/2016 12:10:28 PMAPASS
Ryan Phone #: ###-####
BLD15-03925 BLD-Energy code compliance8/3/20168/4/20168/4/2016 10:33:45 AMAPART
Charlie Phone #: ###-####,, ok after fire blocking
BLD16-02065 BLD-Final8/3/20168/4/20168/4/2016 10:32:37 AMAPASS
Brett Phone #: ###-####
BLD15-04136 BLD-Final8/4/20168/4/20168/4/2016 12:00:00 AMPDONE
as per phone call with Tony Young all requirments were met