MIS16-00334
| MIS-Aging Inspection | 8/4/2017 | 8/4/2017 | 8/9/2017 9:01:34 AM | | PEND |
|
|
|
BLD16-00890
| BLD-Conference | 8/3/2017 | 8/4/2017 | 8/4/2017 5:52:18 PM | P | PASS |
|
|
I have some interior trim to do and painting on the outside but was told I should get the inspection for the structure. Thanx, Jim Phone #: ###-#### Inspection requested via web by James Friedrich
|
BLD15-01118
| BLD-Other | 8/4/2017 | 8/4/2017 | 8/4/2017 5:52:05 PM | P | PASS |
|
|
Fire colcking // Ed Phone #: ###-####
|
BLD17-00249
| BLD-Energy code compliance | 8/4/2017 | 8/4/2017 | 8/4/2017 3:36:21 PM | P | NR |
|
|
larry Phone #: ###-####
|
BLD15-01118
| BLD-Framing/Rough-in | 8/4/2017 | 8/4/2017 | 8/4/2017 3:14:21 PM | P | PASS |
|
|
Ed Phone #: ###-####,, ok pending trades
|
BLD17-01927
| BLD-Final | 8/3/2017 | 8/4/2017 | 8/4/2017 2:51:27 PM | P | PASS |
|
|
Edger Sanchez Phone ###-####. Please call prior to inspection. As well Certificate of Completion is needed for inspection. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Edgar Sanchez// c of c issued
|
BLD17-01927
| DOC - Permit Finaled | 8/4/2017 | 8/4/2017 | 8/4/2017 2:50:32 PM | P | PASS |
|
|
|
BLD17-02720
| BLD-Framing/Rough-in | 8/4/2017 | 8/4/2017 | 8/4/2017 2:50:01 PM | P | NR |
|
|
Ryan Phone #: ###-####
|
BLD17-00103
| BLD-Final | 8/2/2017 | 8/4/2017 | 8/4/2017 1:33:33 PM | A | PASS |
|
|
Kevin Phone #: ###-####
|
BLD17-00103
| DOC - Permit Finaled | 8/4/2017 | 8/4/2017 | 8/4/2017 1:33:22 PM | P | PASS |
|
|
C OF O ISSUED
|
BLD17-00666
| BLD-Footing | 8/3/2017 | 8/4/2017 | 8/4/2017 1:20:00 PM | P | PART |
|
|
Dan Phone #: ###-####,, footings for the existing home ok,, work in progress,, viewed compaction test results,, ok
|
BLD17-00978
| BLD-Final | 8/1/2017 | 8/4/2017 | 8/4/2017 12:44:54 PM | A | NR |
|
|
Mandy Phone #: ###-####,, still 2 piles
|
MIS17-00237
| BLD-Conference | 8/3/2017 | 8/4/2017 | 8/4/2017 12:28:10 PM | P | PASS |
|
|
customer came in said work was being done w/o permits-says it''s a BIG interior remodel/// status review,, building permit issued,, ok
|
MIS17-00237
| DOC - Permit Finaled | 8/4/2017 | 8/4/2017 | 8/4/2017 12:28:04 PM | P | PASS |
|
|
|
BLD17-01141
| BLD-Conference | 8/3/2017 | 8/4/2017 | 8/4/2017 12:27:37 PM | A | PART |
|
|
Brandon Phone #: ###-#### frame walk through conference only, footings were looked at with other townhouse, just this one was not called in,, ok
|
BLD17-01142
| BLD-Conference | 8/3/2017 | 8/4/2017 | 8/4/2017 12:26:14 PM | A | PEND |
|
|
Brandon Phone #: ###-####,, frame walk through conference only
|
BLD17-01472
| BLD-Footing | 8/3/2017 | 8/4/2017 | 8/4/2017 11:03:37 AM | A | PEND |
|
|
Inspection can be done later in the AM. Jimmy will be doing the installation and his cell number is ###-####. We will have the MTI subgrade report with us. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch,, needs soils 1st
|
BLD17-00341
| BLD-Framing/Rough-in | 8/2/2017 | 8/4/2017 | 8/4/2017 11:02:42 AM | A | NR |
|
|
Chris Phone #: ###-####,, needs fire sprinklers 1st,, conf walk through only
|
BLD17-00249
| BLD-Energy code compliance | 8/3/2017 | 8/4/2017 | 8/4/2017 9:52:50 AM | A | NR |
|
|
larry Phone #: ###-####
|