Inspections for the day of: Friday, August 4, 2017.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS16-00334 MIS-Aging Inspection8/4/20178/4/20178/9/2017 9:01:34 AM PEND
BLD16-00890 BLD-Conference8/3/20178/4/20178/4/2017 5:52:18 PMPPASS
I have some interior trim to do and painting on the outside but was told I should get the inspection for the structure. Thanx, Jim Phone #: ###-#### Inspection requested via web by James Friedrich
BLD15-01118 BLD-Other8/4/20178/4/20178/4/2017 5:52:05 PMPPASS
Fire colcking // Ed Phone #: ###-####
BLD17-00249 BLD-Energy code compliance8/4/20178/4/20178/4/2017 3:36:21 PMPNR
larry Phone #: ###-####
BLD15-01118 BLD-Framing/Rough-in8/4/20178/4/20178/4/2017 3:14:21 PMPPASS
Ed Phone #: ###-####,, ok pending trades
BLD17-01927 BLD-Final8/3/20178/4/20178/4/2017 2:51:27 PMPPASS
Edger Sanchez Phone ###-####. Please call prior to inspection. As well Certificate of Completion is needed for inspection. Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Edgar Sanchez// c of c issued
BLD17-01927 DOC - Permit Finaled8/4/20178/4/20178/4/2017 2:50:32 PMPPASS
BLD17-02720 BLD-Framing/Rough-in8/4/20178/4/20178/4/2017 2:50:01 PMPNR
Ryan Phone #: ###-####
BLD17-00103 BLD-Final8/2/20178/4/20178/4/2017 1:33:33 PMAPASS
Kevin Phone #: ###-####
BLD17-00103 DOC - Permit Finaled8/4/20178/4/20178/4/2017 1:33:22 PMPPASS
C OF O ISSUED
BLD17-00666 BLD-Footing8/3/20178/4/20178/4/2017 1:20:00 PMPPART
Dan Phone #: ###-####,, footings for the existing home ok,, work in progress,, viewed compaction test results,, ok
BLD17-00978 BLD-Final8/1/20178/4/20178/4/2017 12:44:54 PMANR
Mandy Phone #: ###-####,, still 2 piles
MIS17-00237 BLD-Conference8/3/20178/4/20178/4/2017 12:28:10 PMPPASS
customer came in said work was being done w/o permits-says it''s a BIG interior remodel/// status review,, building permit issued,, ok
MIS17-00237 DOC - Permit Finaled8/4/20178/4/20178/4/2017 12:28:04 PMPPASS
BLD17-01141 BLD-Conference8/3/20178/4/20178/4/2017 12:27:37 PMAPART
Brandon Phone #: ###-#### frame walk through conference only, footings were looked at with other townhouse, just this one was not called in,, ok
BLD17-01142 BLD-Conference8/3/20178/4/20178/4/2017 12:26:14 PMAPEND
Brandon Phone #: ###-####,, frame walk through conference only
BLD17-01472 BLD-Footing8/3/20178/4/20178/4/2017 11:03:37 AMAPEND
Inspection can be done later in the AM. Jimmy will be doing the installation and his cell number is ###-####. We will have the MTI subgrade report with us. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch,, needs soils 1st
BLD17-00341 BLD-Framing/Rough-in8/2/20178/4/20178/4/2017 11:02:42 AMANR
Chris Phone #: ###-####,, needs fire sprinklers 1st,, conf walk through only
BLD17-00249 BLD-Energy code compliance8/3/20178/4/20178/4/2017 9:52:50 AMANR
larry Phone #: ###-####