Inspections for the day of: Friday, August 4, 2017.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-03416 FIRE-Final Inspection8/4/20178/4/20178/4/2017 3:04:32 PMPCANC
No life safety inspection requierd. I left message on contacts voice mail.


Joey Phone #: ###-####
FIR17-00401 INSP-Final Inspection8/4/20178/4/20178/4/2017 2:43:26 PMPCANC
Mike Phone #: ###-####
FIR17-00166 INSP-Final Inspection8/4/20178/4/20178/4/2017 2:43:18 PMPCANC
Mike Phone #: ###-####
BLD17-01710 FIRE-Final Inspection8/3/20178/4/20178/4/2017 2:07:10 PMACANC
Please contact Kevin Staats for Access 30min Prior ###-#### Phone #: ###-#### Inspection requested via web by Brian McCoy
FIR17-00365 INSP-Sprinkler Rough-in8/4/20178/4/20178/4/2017 2:01:23 PMAPART
The underground supply piping is now installed deap enough and can be covered. The remote FDC piping has not been installed yet in the same trench. I will need another inspection scheduled prior to a complete cover inspection given.
BLD17-02648 FIRE-Final Inspection8/4/20178/4/20178/4/2017 1:59:38 PMPFAIL
Provide city approved plans, remove the thumbturn dead bolt as discussed.
BLD17-02526 FIRE-Final Inspection8/4/20178/4/20178/4/2017 1:59:02 PMPFAIL
Provide city approved plans, remove the thumb turn dead bolt from the main exit as discussed, provide a tagged fire extinguisher as discussed.
BLD17-02684 FIRE-Final Inspection8/3/20178/4/20178/4/2017 1:15:26 PMAPASS
Life safety passed
BLD17-00961 FIRE-Final Inspection8/4/20178/4/20178/4/2017 12:24:46 PMPFAIL
One of the two smoke detectors is located too close to an air register (3'-0" min.). A permit is required for this work.
FIR17-00356 INSP-Sprinkler Rough-in8/3/20178/4/20178/4/2017 12:23:43 PMAPASS
See the city approved plans for locations marked "ok" where piping is ok to cover. Also work located at the Moon's Restraunt has not been completed. If it is to be completed under another permit this permit will need to be modified to remove this work from the scope of work.
FIR17-00254 INSP-Final Inspection8/2/20178/4/20178/4/2017 10:43:24 AMAPASS
Permit finaled
NAF17-00053 INSP-Final8/3/20178/4/20178/4/2017 10:42:51 AMAFAIL
Repair the three exit signs.
NAF17-00023 INSP-Sprinkler Rough-in/Hydro8/3/20178/4/20178/4/2017 9:57:46 AMAPART
Inspection turned into a conference. Hydro test has already been performed. Earth quake bracing is not installed in the approved locations. It will need to be installed as approved or calculations resubmitted for the new locations. Retaining straps are still not installed correctly. Need cap on FDC. Need sticker on bell. Need service tag on riser. Need data sheet on the test valve that it has the correct orfice for the inspector test. Need forward flush done. And ultimately need the fire alarm interconnections verified.
FIR17-00392 INSP-Final Inspection8/3/20178/4/20178/4/2017 9:47:51 AMPCANC
Inspecting Technician: Ray McQueen
Building access: building is open
Building contact: Scott, ###-#### Phone #: ###-#### >> Inspection requested via web by Rose Peterson Inspection cancelled from web by: Rose Peterson
FIR16-00580 INSP-Final Inspection8/3/20178/4/20178/4/2017 7:41:43 AMAPASS
permit finaled
NAF17-00027 INSP-Final8/3/20178/4/20178/4/2017 12:00:00 AMAPASS
OK to final.