Inspections for the day of: Tuesday, August 4, 2020.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR20-00380 INSP-Final Inspection7/28/20208/4/20208/4/2020 4:15:55 PMPFAIL
Fire bell by FDC rang only with flow from the wet system in the fire pump room, bell needs to ring during water flow on all of the other sprinkler systems throughout the building as well. Pull stations exceed 48 inches off of finish floor. PIV tamper could not be tested on the northwest side of building, PIV handle is seized and would not turn. Demo old NAC panel that is no longer in service. Tamper valve on hose valves from riser 5 needs to be connected per IFC 903.4. Provide conduit connector for riser 5 OS&Y tamper as discussed. Tamper switch on riser 6 would not stay clear, was determined that switch will need to be replaced. Other than items noted fire sprinkler monitoring is complete.

Crane Alarm and sprinkler contractor will be on site at 12:00PM Phone #: ###-#### Inspection requested via web by Fire Scheduler
BLD20-00796 FIRE-Conference8/3/20208/4/20208/4/2020 4:07:36 PMADONE
Fire conference is complete.

Curtis *screened* Phone #: ###-####
FIR20-00013 INSP-Final Inspection7/29/20208/4/20208/4/2020 3:50:27 PMPPASS
Final inspection for scope of work is complete.

Please call 20-30 minutes prior to inspection. You will be meeting technician Justin Volquarden on site. Phone #: ###-#### Inspection requested via web by jason petty
FIR20-00014 INSP-Final Inspection7/29/20208/4/20208/4/2020 3:50:08 PMPPASS
Final inspection for scope of work is complete.

Please call 20-30 minutes prior to inspection. You will be meeting technician Justin Volquardsen on site. Phone #: ###-#### Inspection requested via web by jason petty
FIR20-00015 INSP-Final Inspection7/29/20208/4/20208/4/2020 3:49:40 PMPPASS
Final inspection for scope of work is complete.

Please call 20-30 minutes prior to inspection. You will be meeting technician Justin Volquardsen on site. Phone #: ###-#### Inspection requested via web by jason petty
BLD20-00330 FIRE-Final Inspection8/3/20208/4/20208/4/2020 9:46:01 AMAPASS
Previously noted items have been corrected, no fire sprinklers, no fire alarms, duct detectors are stand-alone and functional with annuciators, fire extingiushers are placed with current inspection tags. Final life fire safety inspection complete, signature card not available at time of inspection.

Sean *screened* Phone #: ###-####
BLD20-02241 FIRE-Final Inspection8/3/20208/4/20208/4/2020 8:25:06 AMAPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection is complete, signatures provided on permit sign off card.

Screened- Reza Phone #: ###-####
FIR20-00135 INSP-Final Inspection8/3/20208/4/20208/4/2020 8:20:28 AMACANC
screened // Jonathan Phone #: ###-#### Inspection cancelled from web by: Jonathan Lee
FIR20-00133 INSP-Final Inspection8/3/20208/4/20208/4/2020 8:20:24 AMACANC
screened // Jonathan Phone #: ###-#### Inspection cancelled from web by: Jonathan Lee
FIR20-00130 INSP-Final Inspection8/3/20208/4/20208/4/2020 8:20:20 AMACANC
screened // Jonathan Phone #: ###-#### Inspection cancelled from web by: Jonathan Lee
FIR20-00129 INSP-Final Inspection8/3/20208/4/20208/4/2020 8:20:16 AMACANC
screened // Jonathan Phone #: ###-#### Inspection cancelled from web by: Jonathan Lee
FIR20-00121 INSP-Final Inspection8/3/20208/4/20208/4/2020 8:20:13 AMACANC
screened // Jonathan Phone #: ###-#### Inspection cancelled from web by: Jonathan Lee
BLD20-01684 FIRE-Final Inspection8/3/20208/4/20208/4/2020 8:11:13 AMAFAIL
Fire alarm notification required in changing room, a seperate permit is required for all fire alarm modifications. Provide annual inspection for fire extingiusher. Provide suite number for tenant space.

Nicole Phone #: ###-####
FIR20-00490 INSP-Final Inspection8/3/20208/4/20208/4/2020 8:08:59 AMAPASS
Final fire sprinkler inspection for scope of work is complete.

Thank you have a good day Phone #: ###-#### Inspection requested via web by jeremiah robison