PLM95-01942
| INSP - Final | 8/5/1996 | 8/5/1996 | 8/5/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 2 BASIN 3 TUB 2 SHR 1 SINK 1 W/B 1 W/H 1 L/T 1 W/S 1 FINAL O/K 8/5/6 347
|
PLM96-00897
| INSP - Final | 8/5/1996 | 8/5/1996 | 8/5/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - W/C 3 BASIN 5 TUB 2 SHR 2 SINK 1 W/B 1 W/H 1 L/T 1 FINAL O/K 8/5/6 347
|
PLM96-01350
| INSP - Plumbing Rough-in | 8/5/1996 | 8/5/1996 | 8/5/1996 12:00:00 AM | | FAIL |
|
|
/ / 347 - NOT READY 8/5/6 347
|
PLM96-01350
| INSP - Final | 8/5/1996 | 8/5/1996 | 8/5/1996 12:00:00 AM | | FAIL |
|
|
/ / 347 - NOT READY 8/5/6 347
|