ELE01-04140
| Electrical Rough-In | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PART |
|
|
###-####
Main building ok 1 recep missing above garage and 2 boxes require grounding 8/5/2002 10:20:01 AM
|
ELE02-00838
| Final | 7/25/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | CANC |
|
|
###-#### JAMES JAMES CANC THIS INSPECTION NOT READY 8-5-02///DLD
|
ELE02-00838
| Final | 7/25/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | NR |
|
|
###-#### JAMES
canceled 8/5/2002 10:19:02 AM
|
ELE02-02061
| Final | 8/1/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | NH |
|
|
344- 7729 after three
rang doorbell got no answer tried to phone for 5 min. got buisy signal left notice. 8/5/2002 3:33:44 PM
|
ELE02-02269
| Electrical Rough-In | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 13:33:04. Contact: ###-####.
|
ELE02-01191
| Final | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
###-#### jim
|
ELE02-00390
| Final | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | FAIL |
|
|
Reversed polarity GFCI not working and postion of receps 8/5/2002 2:01:16 PM
|
ELE01-04140
| Electrical Rough-In | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
R/I OK
|