BLD02-01759
| BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PART |
|
|
marlene removed hold, verify duplex "project" as finalled.. 8/5/2002 1:16:29 PM
|
BLD02-01758
| BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PASS |
|
|
w/ owner...no "hold" per Marlene 8/5/2002 1:15:43 PM
|
BLD00-03729
| BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PASS |
|
|
re partial...W/ BRUCE; WILL RECALL FOR 8-7; HANDRAILS INSTALLED AT "RAMP" TO MAIN ENTRY OF NEW PORTION. 8/5/2002 11:21:43 AM
|
BLD01-03163
| BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
duplex prior to conversion; parcel hold removed per malene. 8/5/2002 1:54:09 PM
|
BLD02-01497
| BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
w/ bldr, need insp for cover 8/5/2002 3:40:17 PM
|
BLD02-01758
| BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | CANC |
|
|
|
BLD01-03163
| BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | CANC |
|
|
|
BLD01-03163
| BLD-Conference | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
w/ Marlene re final, parcel ok 8/5/2002 3:40:41 PM
|