PLM02-02398
| Plumbing Rough-in | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | NR |
|
|
###-#### Sharon
|
PLM02-02354
| Water and/or Sewer | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 13:37:34. Contact: ###-####.
|
PLM02-02360
| Water and/or Sewer | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 13:39:46. Contact: ###-####. inspection cancled by rob not ready 8-5-02
|
PLM02-02356
| Water and/or Sewer | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 13:40:27. Contact: ###-####.
|
PLM02-02358
| Water and/or Sewer | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 13:41:18. Contact: ###-####.
|
PLM02-02227
| Water and/or Sewer | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PART |
|
|
grease intercepter water test ok need to pipe inlet to twelve inches from bottom of tank 8/5/2002 11:42:38 AM
|
PLM02-01838
| Final | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PART |
|
|
need single handle or lever handle faucet,s on handicapp laves install permanent ladder for water heater oked temp 8/5/2002 11:40:33 AM
|
PLM02-02398
| Groundwork | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PASS |
|
|
groundwork for breakroom sink and one hand sink in basement air test ok 8/5/2002 12:41:01 PM
|
PLM02-02414
| Water and/or Sewer | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
|
PLM02-02397
| Final | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | CANC |
|
|
###-#### jeff canc. by jeff 8/5/2002 5:10:43 PM
|