Inspections for the day of: Monday, August 5, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Ray
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE02-02136 Electrical Rough-In8/2/20028/5/20028/5/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/02/2002 at 10:48:50. Contact: ###-####. 300-4 1 1/4 protection/ 8/5/2002 9:42:04 AM
ELE02-02384 Temporary Service7/30/20028/5/20028/5/2002 12:00:00 AMAPASS
steve ###-#### p/s ug n ok 8/5/2002 1:54:19 PM
ELE02-01822 Final8/1/20028/5/20028/5/2002 12:00:00 AMPPASS
BRUCE PLEASE CALL 15 MIN BEFORE SO BRUCE CAN MEET WITH YOU; Phone #: ###-####
ELE02-02415 Final8/1/20028/5/20028/5/2002 12:00:00 AMPPASS
###-#### A\C
ELE02-02437 Electrical Rough-In8/5/20028/5/20028/5/2002 12:00:00 AMPPART
conference only ###-#### butch
ELE02-02388 Final8/5/20028/5/20028/5/2002 12:00:00 AMPPASS
CHRIS; Phone #: ###-####
ELE02-02292 Rough-In Permanent Service8/5/20028/5/20028/5/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/05/2002 at 09:49:22. Contact: ###-####. p/s ug n ok 8/5/2002 1:55:07 PM
ELE01-01773 Final8/5/20028/5/20028/5/2002 12:00:00 AMPPASS
###-#### CHRIS NEEDS YOU TO CALL HIM FIRST \\NEEDS A FINAL SO HE CAN GET HIS FINAL ON THE BLD.