FIR02-00248
| INSP-Final Inspection | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 10:31:52. Contact: ###-####. need plans; strap not installed in data room; strap not bent over beam 8/5/2002 10:19:54 AM
|
BLD01-03067
| BLD-Final | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PART |
|
|
PHASE #2 ###-#### WENDLE will complete the final inspection when the job is complete 8/5/2002 9:35:29 AM
|
FIR02-00210
| INSP-Supply line flush | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | PART |
|
|
###-#### RICK see FIR02-00168 for flush 8/5/2002 1:48:06 PM
|
BLD02-01106
| FIRE-Final Inspection | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | A | FAIL |
|
|
extinguisher; need exit signs as shown on plans; door #305 not installed
|
FIR02-00289
| INSP-Sprinkler Rough-in/Hydro | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 08/05/2002 at 10:24:56. Contact: ###-####.
|
FIR02-00168
| INSP-Supply line flush | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
ug flush okay 8/5/2002 1:47:48 PM
|
FIR02-00210
| INSP-Sprinkler Rough-in | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PART |
|
|
awaiting tenting; r/i okay
|
BLD02-00685
| FIRE-Final Inspection | 8/5/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
|
FIR02-00110
| INSP-Final Inspection | 8/2/2002 | 8/5/2002 | 8/5/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 15:59:56. Contact: .
|