Inspections for the day of: Monday, August 5, 2002.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00294 INSP-Supply line flush8/2/20028/5/20028/5/2002 12:00:00 AMAFAIL
the thrust block pored by the contractor at the united water tie-in completly covers all of the pipe and fittings. There is no way to verify pipe, fittings or installation. I left correction notice asking contractor to remove thrust block so items can be verified 8/5/2002 9:13:40 AM
FIR02-00294 INSP-Sprinkler Rough-in/Hydro8/5/20028/5/20028/5/2002 12:00:00 AMAPASS
Underground tie-in to the united water line OK for cover
BLD02-00064 FIRE-Final Inspection8/5/20028/5/20028/5/2002 12:00:00 AMPFAIL
duct detector needs to be tested and door hardware installed 8/5/2002 3:37:10 PM
FIR02-00276 INSP-Final Inspection8/5/20028/5/20028/5/2002 12:00:00 AMPPASS
fire sprinkler system finaled
FIR02-00294 INSP-Sprinkler Rough-in/Hydro8/5/20028/5/20028/5/2002 12:00:00 AMPPASS
bedding OK for underground supply. Underground OK for cover
BLD02-00933 FIRE-Final Inspection8/2/20028/5/20028/5/2002 12:00:00 AMPPASS
fire life/safety finaled 8/5/2002 1:14:42 PM