ELE02-01000
| ELE-Aging Inspection | 8/5/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | | PART |
|
|
WSUC 8/6/2003 7:55:50 AM
|
ELE03-02270
| Electrical Rough-In | 8/4/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 10:43:04 AM. Contact: ###-####. no access called 8/5/2003 8:50:38 AM
|
ELE03-02356
| Rough-In Permanent Service | 8/4/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | A | PASS |
|
|
###-#### r/i ok
p/s u/g new ok 8/5/2003 9:41:34 AM
|
ELE03-02364
| Final | 8/4/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | A | PASS |
|
|
1)We upgraded the service to 200amps. 2)We replaced the subpanel(fusebox) in the basement with a 100amp breaker panel.
3)We fed the dryer ckt. and the oven/cooktop ckt. from the new outdoor all-in-one panel. 4)We ran a 20amp 220volt ckt. in IMC out to a sprinkler pump receptacle which is controlled by a float switch and a pump start relay.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE03-01469
| Final | 8/4/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 4:06:10 PM. Contact: ###-####. ok 8/5/2003 8:23:21 AM
|
ELE03-02367
| Final | 8/5/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | P | PASS |
|
|
###-#### pat ok 8/5/2003 12:07:30 PM
|
ELE03-02370
| Temporary Service | 8/5/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | P | NR |
|
|
###-#### see added request 8/5/2003 12:04:56 PM
|