FIR03-00406
| INSP-Sprinkler Rough-in/Hydro | 8/4/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | A | PASS |
|
|
fire sprinkler permit finaled. I notified HCD Construction that a fire sprinkler monitoring system will be required 8/5/2003 3:01:41 PM
|
FIR03-00209
| INSP-Final Inspection | 8/4/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | A | FAIL |
|
|
replace painted pendant in the restroom on the 2nd floor, provide missing canopies, provide tile in the comm. room, provide ceiling in the sky light area, provide tags for riser and backflow preventer, provide knox key box, provide forward flush for the backflow preventor, test all sprinkler devices 8/5/2003 1:08:14 PM
|
FIR03-00228
| INSP-Final Inspection | 8/4/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | A | FAIL |
|
|
replace painted pendant in the restroom on the 2nd floor, provide missing canopies, provide tile in the comm. room, provide ceiling in the sky light area, provide tags for riser and backflow preventer, provide knox key box, provide forward flush for the backflow preventor, test all sprinkler devices 8/5/2003 1:08:23 PM
|
BLD03-00422
| FIRE-Final Inspection | 8/5/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | A | PASS |
|
|
fire life safety finaled
|
BLD03-00439
| FIRE-Final Inspection | 8/4/2003 | 8/5/2003 | 8/5/2003 12:00:00 AM | P | PART |
|
|
nick ###-#### A temporary occupancy was given with Dave Millers permission until either the contractor provides a listing for the smoke detector that states coverage or provides an additional smoke detectors 8/5/2003 4:22:31 PM
|