FIR04-00263
| FIR-Aging Inspection | 8/5/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | | PASS |
|
|
Work is still in progress 8/5/2004 8:46:56 AM
|
FIR04-00189
| INSP-Final Inspection | 8/4/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 3:37:17 PM. Contact: ###-####.
|
FIR04-00416
| INSP-Alarm Testing | 8/4/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/4/2004 at 4:43:28 PM. Contact: ###-####. Final inspection - pass 8/5/2004 3:17:07 PM
|
FIR04-00308
| INSP-Alarm Testing | 8/5/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | P | PASS |
|
|
Cell PH. ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
|
FIR04-00430
| INSP-Final Inspection | 8/5/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/5/2004 at 8:07:38 AM. Contact: ###-####. Installed with modifications to prevent two heads off one inch line; new head fed from office to the east 8/5/2004 8:27:53 AM
|
BLD04-01391
| FIRE-Final Inspection | 8/5/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | P | PASS |
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD04-01053
| FIRE-Final Inspection | 8/5/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | P | CANC |
|
|
george; Phone #: ###-#### Internet Inspection Request from: Annette Moore Rescheduled for 8/6 8/5/2004 2:20:45 PM
|
FIR03-00816
| INSP-Alarm Testing | 8/5/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | P | PASS |
|
|
Tested the flows/tampers - tested okay - bldg A is now supervised by the monitoring company; bldg B is not sprinklered at this time; need to forward flow backflow need blue tags on glycol and wet risers; calc stickers; need locks on wall PIV's for both buildings 8/5/2004 3:10:46 PM
|
FIR02-00005
| INSP-Sprinkler Rough-in/Hydro | 8/4/2004 | 8/5/2004 | 8/5/2004 12:00:00 AM | P | NR |
|
|
brian ; Phone #: ###-#### Internet Inspection Request from: Annette Moore Hydro not holding - rescheduled for 8/6 8/5/2004 2:09:39 PM
|