Inspections for the day of: Thursday, August 5, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-01828 Final8/3/20048/5/20048/5/2004 12:00:00 AMANR
Scheduled by a contractor via Hello! on 8/3/2004 at 12:57:03 PM. Contact: ###-####.
MEC04-02001 Final8/4/20048/5/20048/5/2004 12:00:00 AMANR
Customer is Zijad Rudan and someone will be home their phone # is ###-####. Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
MEC04-02001 Rough-in8/4/20048/5/20048/5/2004 12:00:00 AMAPART
Customer is Zijad Rudan and someone will be home their phone # is ###-####. Thanks, Andrea.; Phone #: ###-#### Internet Inspection Request from: Andrea Creek r/i ok...gas failed 8/5/2004 9:42:06 AM
MEC04-01186 Rough-in8/4/20048/5/20048/5/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 8/4/2004 at 3:16:33 PM. Contact: ###-####. no combustibles (wood) allowed in above ceiling return air plenum 8/5/2004 10:53:07 AM
MEC04-01845 Conference8/4/20048/5/20048/5/2004 12:00:00 AMAPASS
With Dixie Fellows & Jim Sly; Phone #: ###-#### Internet Inspection Request from: Matt Hansen wrote correction notice needing specific requirements on protection of fire/assembly rated walls from engineer 8/5/2004 10:01:17 AM
MEC04-02058 Final8/5/20048/5/20048/5/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/5/2004 at 7:49:58 AM. Contact: ###-####.
MEC04-01637 Conference8/5/20048/5/20048/5/2004 12:00:00 AMPPASS
mark or ###-####; Phone #: ###-#### Internet Inspection Request from: Barbara Moore..off collister 8/5/2004 12:29:05 PM discussed bath fans 8/5/2004 4:11:36 PM
MEC04-01469 Final8/5/20048/5/20048/5/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/5/2004 at 8:08:33 AM. Contact: ###-####.
MEC04-02038 Rough-in8/5/20048/5/20048/5/2004 12:00:00 AMPPASS
There is a framing inspection also scheduled for this afternoon, maybe these can be coordinated. If not, please inspect as early as possible. Thank you.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-02038 Pressure Test8/5/20048/5/20048/5/2004 12:00:00 AMPPASS
There is a framing inspection also scheduled for this afternoon, maybe these can be coordinated. If not, please inspect as early as possible. Thank you.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC04-02001 Final8/5/20048/5/20048/5/2004 12:00:00 AMPPASS
Thanks, Andrea; Phone #: ###-#### Internet Inspection Request from: Andrea Creek no mantle installed at time of final 8/5/2004 1:52:48 PM
MEC04-02001 Final7/30/20048/5/20048/4/2004 12:16:50 PMPCANC
Thanks, Leslie; Phone #: ###-#### Internet Inspection Request from: Andrea Creek Inspection cancelled from web by: Andrea Creek