BLD09-00965
| BLD-Conference | 8/4/2009 | 8/5/2009 | 8/5/2009 4:20:03 PM | P | DONE |
|
|
Jarod Phone #: ###-####. Went over special inspection requirements with contractor as per special inspection start up sheet on approved plans.
|
BLD09-00746
| BLD-Framing/Rough-in | 8/5/2009 | 8/5/2009 | 8/5/2009 2:42:29 PM | P | PASS |
|
|
jim Phone #: ###-####. Interior steel stud framed walls only. Noted no elec. or plumbing in walls.
|
MIS09-00126
| BLD-Final | 8/5/2009 | 8/5/2009 | 8/5/2009 1:59:28 PM | P | FAIL |
|
|
Scott--Please call after inspection Phone #: ###-####. Needs to remove skirting were tie downs are located for inspection. Scott was notified.
|
BLD09-01206
| BLD-Footing | 8/5/2009 | 8/5/2009 | 8/5/2009 1:37:58 PM | P | PASS |
|
|
Phone #: ###-####
|
ESC09-00456
| Site Preparation | 8/5/2009 | 8/5/2009 | 8/5/2009 1:37:47 PM | P | PASS |
|
|
ESC permit sign posted. All excavated material is contained in backyard. No conc. washout required due to small size of job.
|
BLD07-02147
| BLD-Energy code compliance | 8/4/2009 | 8/5/2009 | 8/5/2009 10:08:54 AM | A | PASS |
|
|
ray - after 10 please Phone #: ###-####. ok for cover.
|
BLD09-01257
| BLD-Final | 8/4/2009 | 8/5/2009 | 8/5/2009 9:20:11 AM | A | PASS |
|
|
Hadley Phone #: ###-####. Locking hardware removed and lever type installed. ok for perm occ.
|
MIS09-00149
| BLD-Conference | 8/4/2009 | 8/5/2009 | 8/5/2009 9:01:03 AM | A | DONE |
|
|
complaint of roofing without permit
|
MIS09-00149
| DOC - Permit Finaled | 8/5/2009 | 8/5/2009 | 8/5/2009 9:00:53 AM | P | PASS |
|
|
Told roofing contractor to pull permit. A parcell hold was placed.
|