BLD04-01642
| BLD-Aging Inspection | 8/5/2013 | 8/5/2013 | 8/13/2013 8:06:58 AM | | DONE |
|
|
|
BLD12-01951
| BLD-Ceiling Grid Inspection | 8/5/2013 | 8/5/2013 | 8/5/2013 4:17:47 PM | P | PASS |
|
|
john Phone #: ###-####
|
BLD13-01905
| BLD-Framing/Rough-in | 8/5/2013 | 8/5/2013 | 8/5/2013 4:15:23 PM | P | PASS |
|
|
rob Phone #: ###-#### Told Ron to call for Fire conference to check out sprinkler placement.
|
BLD13-02119
| BLD-Footing | 8/2/2013 | 8/5/2013 | 8/5/2013 1:55:47 PM | P | PASS |
|
|
aaron Phone #: ###-####
|
BLD13-01700
| BLD-Framing/Rough-in | 8/5/2013 | 8/5/2013 | 8/5/2013 1:55:03 PM | P | PASS |
|
|
jeremy Phone #: ###-####
|
GCB13-00024
| GCB-Energy | 8/5/2013 | 8/5/2013 | 8/5/2013 1:54:15 PM | P | PASS |
|
|
Josh ###-####
|
GCB13-00023
| GCB-Energy | 8/5/2013 | 8/5/2013 | 8/5/2013 1:53:19 PM | P | PASS |
|
|
Josh ###-####
|
BLD13-00093
| BLD-Final | 8/2/2013 | 8/5/2013 | 8/5/2013 1:52:08 PM | A | NR |
|
|
Need final on separate foundation permit # BLD11-2178 and final letter of approval from Engineer of record, prior to calling for final structural inspection. Need to verify that all other finals have been done.
|
BLD11-02178
| BLD-Final | 8/2/2013 | 8/5/2013 | 8/5/2013 1:46:10 PM | A | NR |
|
|
Need to complete all concrete on scope of work, provide final letter of approval from MTI and Engineer of record.
|
BLD13-02069
| BLD-Footing | 8/2/2013 | 8/5/2013 | 8/5/2013 12:52:46 PM | A | PASS |
|
|
clint Phone #: ###-####
|
MIS13-00223
| DOC - Permit Finaled | 8/5/2013 | 8/5/2013 | 8/5/2013 12:50:25 PM | P | PASS |
|
|
|
BLD13-01986
| BLD-Final | 8/2/2013 | 8/5/2013 | 8/5/2013 12:49:35 PM | A | PASS |
|
|
teresa Phone #: ###-#### C/C issued
|
BLD13-01986
| DOC - Permit Finaled | 8/5/2013 | 8/5/2013 | 8/5/2013 12:49:11 PM | P | PASS |
|
|
|