Inspections for the day of: Monday, August 5, 2013.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-01642 BLD-Aging Inspection8/5/20138/5/20138/13/2013 8:06:58 AM DONE
BLD12-01951 BLD-Ceiling Grid Inspection8/5/20138/5/20138/5/2013 4:17:47 PMPPASS
john Phone #: ###-####
BLD13-01905 BLD-Framing/Rough-in8/5/20138/5/20138/5/2013 4:15:23 PMPPASS
rob Phone #: ###-####
Told Ron to call for Fire conference to check out sprinkler placement.
BLD13-02119 BLD-Footing8/2/20138/5/20138/5/2013 1:55:47 PMPPASS
aaron Phone #: ###-####
BLD13-01700 BLD-Framing/Rough-in8/5/20138/5/20138/5/2013 1:55:03 PMPPASS
jeremy Phone #: ###-####
GCB13-00024 GCB-Energy8/5/20138/5/20138/5/2013 1:54:15 PMPPASS
Josh ###-####
GCB13-00023 GCB-Energy8/5/20138/5/20138/5/2013 1:53:19 PMPPASS
Josh ###-####
BLD13-00093 BLD-Final8/2/20138/5/20138/5/2013 1:52:08 PMANR
Need final on separate foundation permit # BLD11-2178 and final letter of approval from Engineer of record, prior to calling for final structural inspection. Need to verify that all other finals have been done.
BLD11-02178 BLD-Final8/2/20138/5/20138/5/2013 1:46:10 PMANR
Need to complete all concrete on scope of work, provide final letter of approval from MTI and Engineer of record.
BLD13-02069 BLD-Footing8/2/20138/5/20138/5/2013 12:52:46 PMAPASS
clint Phone #: ###-####
MIS13-00223 DOC - Permit Finaled8/5/20138/5/20138/5/2013 12:50:25 PMPPASS
BLD13-01986 BLD-Final8/2/20138/5/20138/5/2013 12:49:35 PMAPASS
teresa Phone #: ###-####
C/C issued
BLD13-01986 DOC - Permit Finaled8/5/20138/5/20138/5/2013 12:49:11 PMPPASS