FIR13-00095
| INSP-Final Inspection | 8/1/2013 | 8/5/2013 | 8/5/2013 3:41:44 PM | P | CANC |
|
|
don Phone #: ###-####
|
FIR13-00290
| INSP-Sprinkler Rough-in/Hydro | 8/5/2013 | 8/5/2013 | 8/5/2013 3:11:40 PM | P | PASS |
|
|
Underground hydro test passed.
|
FIR13-00184
| INSP-Sprinkler Rough-in | 8/1/2013 | 8/5/2013 | 8/5/2013 2:18:21 PM | P | PART |
|
|
Todays inspection was for the remaining first floor east corridor which has not been connected but is ok to cover. Also todays inspection was for the cafeteria which was already covered. Seismic bracing is missing on the branch lines and the 1 1/2" far main. Also the pipe routing has been modified for the branchlines and the new arm overs to the pendant heads. Plan modifications are required showing all of these changes and all of the other piping changes through-out the new system. Include the sprinkler heads model changes and revised hydraulic calculations.
|
FIR13-00204
| INSP-Sprinkler Rough-in | 8/2/2013 | 8/5/2013 | 8/5/2013 10:58:38 AM | A | PART |
|
|
The retail area ceilings are ok to cover piping. I noted one location where pendant mount lighting is blocking the pendant sprinkler heads. The three time rule of NFPA 13 chapter 8 should apply.
|
BLD13-01343
| FIRE-Final Inspection | 8/1/2013 | 8/5/2013 | 8/5/2013 10:38:13 AM | A | CANC |
|
|
To be canceled per Greg Kirkes. I've rescheduled it for tomorrow.
|
FIR13-00248
| INSP-Sprinkler Rough-in | 8/2/2013 | 8/5/2013 | 8/5/2013 9:43:46 AM | A | PASS |
|
|
Underground ok to cover as marked on the plan.
|
BLD12-02415
| FIRE-Final Inspection | 8/2/2013 | 8/5/2013 | 8/5/2013 9:43:13 AM | A | PART |
|
|
The Prep/Rec rooms and the west entry life safety has passed.
|
FIR13-00184
| INSP-Sprinkler Rough-in | 8/1/2013 | 8/5/2013 | 8/1/2013 12:17:07 PM | P | CANC |
|
|
We need a 1st floor inspection. Please call Bruce 30 mins prior. Phone #: ###-#### >> Inspection requested via web by Jacci Hunt Inspection cancelled from web by: Jacci Hunt
|