ESC13-00082
| General Inspection | 8/5/2013 | 8/5/2013 | 8/6/2013 7:04:33 AM | | CANC |
|
|
|
ESC13-00339
| BMP Violation | 8/1/2013 | 8/5/2013 | 8/5/2013 1:03:45 PM | A | FAIL |
|
|
SWO posted
|
ESC13-00520
| Site Preparation | 8/2/2013 | 8/5/2013 | 8/5/2013 11:29:21 AM | A | FAIL |
|
|
KEITH Phone #: ###-####. Called to ask where plans are. Keith is on his way to site with plans. Waited around for 45 minutes. Reschedule site prep inspection when plans are on site
|
ESC13-00013
| BMP Violation | 8/5/2013 | 8/5/2013 | 8/5/2013 11:29:20 AM | P | FAIL |
|
|
Inspection requested to lift SWO. Inspection failed
|
ESC13-00683
| Site Preparation | 8/2/2013 | 8/5/2013 | 8/5/2013 10:37:13 AM | A | PASS |
|
|
dirk Phone #: ###-####. Wattles need a few more stakes. Dirk will bring more stakes up to intall min 4' apart. Discussed washout containment options
|
ESC12-00689
| General Inspection | 8/5/2013 | 8/5/2013 | 8/5/2013 7:09:58 AM | | PASS |
|
|
Waiting for vegetation to grow. Site stabilized
|
ESC11-00844
| Aging Inspection | 8/5/2013 | 8/5/2013 | 8/5/2013 7:09:28 AM | | PASS |
|
|
no activity
|
ESC10-00926
| Aging Inspection | 8/5/2013 | 8/5/2013 | 8/5/2013 7:08:53 AM | | CANC |
|
|
|
ESC10-00926
| DOC - Permit Finaled | 8/5/2013 | 8/5/2013 | 8/5/2013 7:08:46 AM | A | PASS |
|
|
Permit expired
|