BLD14-01264
| BLD-Framing/Rough-in | 8/4/2014 | 8/5/2014 | 8/5/2014 3:48:06 PM | P | PART |
|
|
Framing inspection so we can insulate. Thank you Phone #: ###-#### Inspection requested via web by Joshua Edwardsf8 floor truss need repair.
|
BLD13-00357
| BLD-Framing/Rough-in | 8/5/2014 | 8/5/2014 | 8/5/2014 3:05:41 PM | P | PASS |
|
|
Mike Phone #: ###-#### exterior ok to cover
|
BLD14-00472
| BLD-Final | 8/4/2014 | 8/5/2014 | 8/5/2014 2:33:16 PM | P | FAIL |
|
|
Don Phone #: ###-#### fire chalk/doorlable/smokeseal
|
BLD14-01057
| BLD-Final | 8/1/2014 | 8/5/2014 | 8/5/2014 2:00:04 PM | P | PASS |
|
|
Ron Phone #: ###-####
|
BLD14-01391
| BLD-Foundation | 8/4/2014 | 8/5/2014 | 8/5/2014 8:43:02 AM | A | PASS |
|
|
Doug-late AM pour time noon Phone #: ###-####
|
BLD11-01806
| BLD-Aging Inspection | 8/5/2014 | 8/5/2014 | 8/5/2014 8:30:43 AM | | DEFR |
|
|
ele pending
|