BLD13-03418
| FIRE-Conference | 8/5/2014 | 8/5/2014 | 8/5/2014 5:07:31 PM | P | PART |
|
|
Inspection for verification of adjusted fire sprinkler coverage at the first floor office 103 completed.
|
FIR14-00269
| INSP-Final Inspection | 8/5/2014 | 8/5/2014 | 8/5/2014 5:04:52 PM | P | PART |
|
|
Items needed prior to final include; provide intermediate temp sprinkler at the main entry area womens restroom adjacent to the HVAC diffuser, remove two travel clips at the south classroom, existing system is overdue annual inspection. Missing escutcheons installed while on site. Remainder of final walkthrough passed.
|
FIR14-00239
| INSP-Final Inspection | 8/5/2014 | 8/5/2014 | 8/5/2014 4:58:33 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR14-00327
| INSP-Sprinkler Rough-in | 8/4/2014 | 8/5/2014 | 8/5/2014 4:56:37 PM | P | PART |
|
|
Overhead work finished. Final walkthrough passed.
|
BLD14-00949
| FIRE-Final Inspection | 8/4/2014 | 8/5/2014 | 8/5/2014 12:27:35 PM | A | PART |
|
|
Fire life safety at the second floor phases two and three completed satisfactory.
|
FIR14-00264
| INSP-Final Inspection | 8/4/2014 | 8/5/2014 | 8/5/2014 12:26:20 PM | A | PART |
|
|
Fire sprinkler work in both phase two and three passed walkthrough and inspection.
|
FIR14-00345
| INSP-Sprinkler Rough-in | 8/4/2014 | 8/5/2014 | 8/5/2014 12:24:03 PM | A | PART |
|
|
Okay to cover fire sprinkler work at the sheetrock ceilings in the break room, coffee, and waiting areas as marked and dated on stamped plans.
|
FIR14-00254
| INSP-Alarm Testing | 8/4/2014 | 8/5/2014 | 8/5/2014 12:22:29 PM | A | PART |
|
|
Fire alarm work at the second floor remodel areas phase 2 and 3 passed functional testing and inspection.
|