ELE14-03246
| Electrical Rough-In | 8/4/2015 | 8/5/2015 | 8/5/2015 2:25:54 PM | P | PASS |
|
|
Levi. Tower 3 floor #2 final. Phone #: ###-#### Inspection requested via web by Sean DeLacy final ok on rms. 210 thru 215. Also corrections made final ok rms. 313 and 314
|
ELE15-02131
| Final | 8/5/2015 | 8/5/2015 | 8/5/2015 1:12:59 PM | P | NR |
|
|
Final inspections units 2nd floor. Phone #: ###-#### Inspection requested via web by Rafael Castillo dishwashers not in yet
|
ELE15-02132
| Final | 8/5/2015 | 8/5/2015 | 8/5/2015 1:10:42 PM | P | NR |
|
|
Final inspections units 2nd floor. Phone #: ###-#### Inspection requested via web by Rafael Castillo dishwashers not in yet
|
ELE15-02132
| Final | 8/5/2015 | 8/5/2015 | 8/5/2015 1:05:45 PM | A | PART |
|
|
Final inspections units 2nd floor. Phone #: ###-#### Inspection requested via web by Rafael Castillo final ok rms. 221, 224 thru 231, 232 thru 241. exterior receptacles not done in rms. 200, 218, 223 and 233. All rooms still need 50% energy efficient lamps.
|
ELE15-02131
| Final | 8/5/2015 | 8/5/2015 | 8/5/2015 12:59:20 PM | A | PART |
|
|
Final inspections 2nd floor units. Phone #: ###-#### Inspection requested via web by Rafael Castillo final ok on rms. 221, 224 thru 231, 232 thru 241 NOTE; o/s receptacles not done in rms. 200, 218,223 and 233 also need 50% energy effiecient lamps throughout.
|
ELE14-01963
| Electrical Rough-In | 8/5/2015 | 8/5/2015 | 8/5/2015 12:29:45 PM | A | PASS |
|
|
Garage ceiling grid inspection west wing. Phone #: ###-#### Inspection requested via web by Rafael Castillo r/i ok t bar ceiling west see e sheets
|
ELE15-02352
| Temporary Service | 8/4/2015 | 8/5/2015 | 8/5/2015 9:34:54 AM | A | FAIL |
|
|
Richard Phone #: ###-#### minimum 6x6 post as per Idaho Power Co.
|
ELE15-02410
| Final | 8/4/2015 | 8/5/2015 | 8/5/2015 9:15:53 AM | A | FAIL |
|
|
Inspection requested via web by Cindie Swaim 110.16- arc flash hazard warning label required on loadcenters. 110.24- service equipment in other than dwellings shall be legibly marked in the field with the maximum available fault current including date of calculation and be of suffiecient durability. ( from Idaho Power). 250 53(D)(2)- supplemental ground rod required. 250.94-intersystem bond termiation required. 250.104(A)- Bond water pipes or sections where required. Also need to call for "permanent service " when ready, then final. No phone number or contact to call
|
ELE15-02161
| Electrical Rough-In | 8/4/2015 | 8/5/2015 | 8/5/2015 8:30:12 AM | A | PASS |
|
|
underground - late morning please Thank you Phone #: ###-#### Inspection requested via web by Celinda Winters r/i underslab 100 % ok
|