FIR15-00031
| INSP-Final Inspection | 8/4/2015 | 8/5/2015 | 8/5/2015 3:10:05 PM | P | FAIL |
|
|
See the city approved plans for modifications needed to the notification circuits. The only initiating devices tested today are the two elevator lobby detectors which functioned correctly.
|
FIR14-00839
| INSP-Conference | 8/4/2015 | 8/5/2015 | 8/5/2015 2:48:04 PM | A | DONE |
|
|
Todays inspection was for certification of the 3 fire pumps. Inspection passed. We found that all three pumps are 3psi to 7psi above on Churn. Both diesel pumps are 4psi to 5psi low at 150%. After conferencing with Tim Frost and Gary with Tolco pumps that this is still acceptable. We actually moved the guages and gained acouple of psi.
|
BLD15-02549
| FIRE-Final Inspection | 8/5/2015 | 8/5/2015 | 8/5/2015 2:42:19 PM | P | FAIL |
|
|
Provide exit signs as per plans, provide emergency lighting at the north exit door, remove or repair the non-functional exit sign in the shop area, provide automatic flush bolts for the inactive leaf of the main exit. I verified with Katie that sprinkler protection would not be required per the IFC.
|