FIR20-00146
| INSP-Sprinkler Rough-in/Hydro | 8/5/2020 | 8/5/2020 | 8/5/2020 6:36:47 PM | P | PART |
|
|
Hydrostatic test for underground supply witnessed with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Lonnie Greenfield
|
FIR19-00804
| INSP-Sprinkler Rough-in | 8/5/2020 | 8/5/2020 | 8/5/2020 6:36:46 PM | P | PART |
|
|
Rough to cover inspection for overhead fire sprinkler piping above restroom hardlids 2 through 9 complete, restroom hardlids 2 through 9 approved for cover.
Inspections for rough to cover in bathrooms, floors 2-9. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
BLD20-01180
| FIRE-Final Inspection | 8/5/2020 | 8/5/2020 | 8/5/2020 2:07:21 PM | P | PASS |
|
|
No fire sprinklers, no fire alarms, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection is complete, signature provided on permit sign off card.
screened // Bob Phone #: ###-####
|
BLD20-02608
| FIRE-Final Inspection | 8/5/2020 | 8/5/2020 | 8/5/2020 2:06:23 PM | P | FAIL |
|
|
Install exit signage and emergency lighting, to include exit discharge landing to public way, on level 1 as shown on city approved documents. Fire sprinkler modifications in basement level will be required, room being used as storage has sprinkler heads overspaced for ordinary hazard, two areas will require sprinkler heads to be added. Wires are attached to the fire sprinkler piping, per NFPA13 no external loads shall be applied to fire sprinkler piping. Fire sprinkler head in basement bathroom is painted, per NFPA13 the fire sprinkler head will required to be replaced. Any and all modifications to the fire sprinkler system will require a seperate permit. Provide fire extinguisher for basement level.
screened // Tanya Phone #: ###-####
|
BLD20-02663
| FIRE-Final Inspection | 8/5/2020 | 8/5/2020 | 8/5/2020 2:00:45 PM | P | FAIL |
|
|
Provide annual inspection on fire sprinkler backflow, test tag on backflow is from 2017, backflow must be tested annually.
screened // Tanya Phone #: ###-####
|
FIR20-00121
| INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 12:17:08 PM | A | PASS |
|
|
Final fire sprinkler inspection is complete, irrigation shutoff witnessed during flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00135
| INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 12:16:45 PM | A | PASS |
|
|
Final fire sprinkler inspection is complete, irrigation shutoff witnessed during flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00133
| INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 12:16:26 PM | A | PASS |
|
|
Final fire sprinkler inspection is complete, irrigation shutoff witnessed during flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00130
| INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 12:16:09 PM | A | PASS |
|
|
Final fire sprinkler inspection is complete, irrigation shutoff witnessed during flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00129
| INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 12:15:46 PM | A | PASS |
|
|
Final fire sprinkler inspection is complete, irrigation shutoff witnessed during flow switch activation.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00129
| INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 12:14:24 PM | A | DONE |
|
|
Hydrostatic test witnessed at city pressure with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00130
| INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 12:14:13 PM | A | DONE |
|
|
Hydrostatic test witnessed at city pressure with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00133
| INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 12:14:04 PM | A | DONE |
|
|
Hydrostatic test witnessed at city pressure with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00135
| INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 12:13:52 PM | A | DONE |
|
|
Hydrostatic test witnessed at city pressure with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00121
| INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/5/2020 12:13:24 PM | A | DONE |
|
|
Hydrostatic test witnessed at city pressure with no pressure loss observed at riser provided gauge.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00434
| INSP-Sprinkler Rough-in/Hydro | 8/5/2020 | 8/5/2020 | 8/5/2020 12:04:42 PM | A | FAIL |
|
|
System could not have hydro performed, cap above furnace closet was cut and removed by others, a re-hydro will be required after repair is made.
|
FIR20-00426
| INSP-Sprinkler Rough-in | 8/4/2020 | 8/5/2020 | 8/5/2020 12:01:01 PM | A | PASS |
|
|
All tenting in place at time of inspection, cover is approved. Cover sticker has been placed.
tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00425
| INSP-Sprinkler Rough-in | 8/4/2020 | 8/5/2020 | 8/5/2020 12:00:45 PM | A | PASS |
|
|
All tenting in place at time of inspection, cover is approved. Cover sticker has been placed.
tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00435
| INSP-Sprinkler Rough-in | 8/4/2020 | 8/5/2020 | 8/5/2020 12:00:29 PM | A | PASS |
|
|
All tenting in place at time of inspection, cover is approved. Cover sticker has been placed.
tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00143
| INSP-Sprinkler Rough-in | 8/4/2020 | 8/5/2020 | 8/5/2020 8:42:58 AM | A | PASS |
|
|
Rough to cover inspection for scope of work is complete, cover is approved. Fire sprinkler head to be added above cooler to cover exposed combustible material, will verify head addition on next inspection.
Tony Cetani is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD20-01684
| FIRE-Final Inspection | 8/4/2020 | 8/5/2020 | 8/5/2020 7:59:19 AM | A | PART |
|
|
Previously noted items have been corrected, fire alarm modification to be completed under FIR20-00530 (addition of one notification devoce in changing room), fire sprinkler inspection complete, fire extingiusher is placed with a current inspection tag. 30 day TCO authorized for life fire safety, final signature contingent upon fire alarm modifications being completed and inspected.
Nicole Phone #: ###-####
|
FIR20-00129
| INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/4/2020 8:18:11 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Jonathan Lee Inspection cancelled from web by: Jonathan Lee
|
FIR20-00121
| INSP-Sprinkler Rough-in/Hydro | 8/4/2020 | 8/5/2020 | 8/4/2020 8:17:52 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Jonathan Lee Inspection cancelled from web by: Jonathan Lee
|
FIR20-00121
| INSP-Final Inspection | 8/4/2020 | 8/5/2020 | 8/4/2020 8:17:46 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Jonathan Lee Inspection cancelled from web by: Jonathan Lee
|
FIR12-00739
| FIR-Aging Inspection | 8/5/2020 | 8/5/2020 | | | |
|
|
|
FIR12-00740
| FIR-Aging Inspection | 8/5/2020 | 8/5/2020 | | | |
|
|
|
FIR13-00119
| FIR-Aging Inspection | 8/5/2020 | 8/5/2020 | | | |
|
|
|
FIR14-00085
| FIR-Aging Inspection | 8/5/2020 | 8/5/2020 | | | |
|
|
|
FIR14-00372
| FIR-Aging Inspection | 8/5/2020 | 8/5/2020 | | | |
|
|
|