BLD97-01303
| INSP-Sprinkler Rough-in/Hydro | 8/5/1998 | 8/6/1998 | 8/6/1998 12:00:00 AM | A | PART |
|
|
BRU ###-#### heads still needed in the shower/corridor area and other areas. they want to open the showers by 8/15 and will have all areas covered with heads and alarms
|
BLD98-01589
| INSP-Final Inspection | 8/6/1998 | 8/6/1998 | 8/6/1998 12:00:00 AM | A | FAIL |
|
|
LARRY WILL CALL TO SCHEDULE A TIME...###-#### discussed requirements for mag hold opens for doors in the core.
|
BLD96-03313
| INSP-Final Inspection | 8/6/1998 | 8/6/1998 | 8/6/1998 12:00:00 AM | P | PART |
|
|
tested stage curtain - 21 second drop time. installed per manufacturers instructions.
|