BLD99-01124
| INSP-Conference | 8/6/1999 | 8/6/1999 | 8/6/1999 12:00:00 AM | A | PART |
|
|
discussed with general contractor about medgas certification; received call from sub contractor about requirements - relayed NFPA 99 requirements
|
BLD99-01125
| INSP-Final Inspection | 8/6/1999 | 8/6/1999 | 8/6/1999 12:00:00 AM | A | PART |
|
|
temp occ approved - need suite numbers
|
BLD99-01491
| INSP-Final Inspection | 8/6/1999 | 8/6/1999 | 8/6/1999 12:00:00 AM | A | PART |
|
|
temp occ approved - need suite number
|
BLD99-01863
| INSP-Final Inspection | 8/5/1999 | 8/6/1999 | 8/6/1999 12:00:00 AM | A | FAIL |
|
|
exit signs; door hardware
|
BLD99-01225
| INSP-Final Inspection | 8/6/1999 | 8/6/1999 | 8/6/1999 12:00:00 AM | P | FAIL |
|
|
DAVE ###-#### FIRE AND LIFE SAFETY need to test alarms; door closure;
|
BLD98-03864
| INSP-Final Inspection | 8/6/1999 | 8/6/1999 | 8/6/1999 12:00:00 AM | P | PASS |
|
|
TIM ###-#### FIRE & LIFE SAFETY occ approved
|