Inspections for the day of: Tuesday, August 6, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01620 BLD-Energy code compliance8/5/20028/6/20028/6/2002 12:00:00 AMAPASS
###-#### rick
BLD02-01474 BLD-Footing8/5/20028/6/20028/6/2002 12:00:00 AMAPASS
JAY ###-#### interior ft ok. 8/6/2002 9:27:23 AM
BLD02-00526 BLD-Final8/5/20028/6/20028/6/2002 12:00:00 AMAPASS
ALAN; Phone #: ###-####
MEC02-01398 Final8/5/20028/6/20028/6/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/05/2002 at 17:14:12. Contact: ###-####.unable to access. 8/6/2002 9:50:10 AM
MEC02-02140 Pressure Test8/6/20028/6/20028/6/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/06/2002 at 10:03:25. Contact: ###-####.60 psi test ok 8/6/2002 3:50:22 PM
BLD02-00880 BLD-Framing/Rough-in8/6/20028/6/20028/6/2002 12:00:00 AMPFAIL
justin just for the garage shear nail; Phone #: ###-#### 503.2.1 ubc 8/6/2002 3:19:22 PM
BLD02-00881 BLD-Framing/Rough-in8/6/20028/6/20028/6/2002 12:00:00 AMPFAIL
justin just for the garage shear nail; Phone #: ###-#### 503.2.1 ubc 8/6/2002 3:19:38 PM
BLD02-00881 BLD-Framing/Rough-in8/6/20028/6/20028/6/2002 12:00:00 AMPFAIL
justin just for the garage shear nail; Phone #: ###-#### 503.2.1 ubc. 8/6/2002 3:20:06 PM
MEC02-02134 Final8/6/20028/6/20028/6/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/06/2002 at 11:10:42. Contact: ###-####.
BLD01-02869 BLD-Final8/6/20028/6/20028/6/2002 12:00:00 AMPPASS
###-#### ALLISONwork complet ventalation ok 8/6/2002 1:54:40 PM
MEC02-02157 Rough-in8/6/20028/6/20028/6/2002 12:00:00 AMPPASS
GREG ###-#### GREG ###-####gas test ok 8/6/2002 4:10:46 PM