PLM02-02411
| Plumbing Rough-in | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | NR |
|
|
###-#### mike
|
PLM02-01662
| Water and/or Sewer | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | PASS |
|
|
JUST FOR THE 1' 1/2 LINE TRAVIS ###-####
|
PLM01-02107
| Final | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/05/2002 at 14:30:56. Contact: ###-####.
|
PLM01-02106
| Final | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/05/2002 at 14:35:38. Contact: ###-####.
|
PLM02-01667
| Plumbing Rough-in | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/05/2002 at 14:42:35. Contact: ###-####.
|
PLM02-02270
| Plumbing Rough-in | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | PART |
|
|
###-#### in wall water and partial overhead test ok ok to cover 8/6/2002 2:52:08 PM
|
PLM02-02397
| Water and/or Sewer | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | PASS |
|
|
|
PLM01-02324
| Plumbing Rough-in | 8/6/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | PASS |
|
|
left note to have t&p relief line piped to approved location and not to pan drain before final inspection 8/6/2002 11:58:31 AM
|
PLM01-02105
| Final | 8/6/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | PASS |
|
|
|
PLM02-01540
| Plumbing Rough-in | 8/6/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/06/2002 at 10:27:51. Contact: ###-####. over head and in wall water test ok vent,s test ok ok to cover 8/6/2002 3:38:00 PM
|
PLM02-01905
| Plumbing Rough-in | 8/6/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | P | PART |
|
|
all drain,s waste and vent test ok water in floor and wall,s ok still need to install tub and shower valves and hose bibbs 8/6/2002 1:02:23 PM
|
PLM02-02411
| Groundwork | 8/6/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | P | PASS |
|
|
|
PLM02-02168
| Sprinkler (Final) | 8/2/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 12:32:23. Contact: ###-####.
|
PLM02-02409
| Plumbing Rough-in | 8/6/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | P | PASS |
|
|
###-#### KEN
|