FIR01-00625
| INSP-Final Inspection | 8/2/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 08/02/2002 at 08:34:54. Contact: .
inspection not done due to no contact number being given. With the site being HP I can't get beyond the security office without a chaperone. 8/6/2002 4:28:13 PM
|
FIR01-00572
| INSP-Final Inspection | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | A | FAIL |
|
|
transformer still needs to be mechanically secured so it can not be unplugged. 8/6/2002 11:52:50 AM
|
FIR02-00273
| INSP-Sprinkler Rough-in/Hydro | 8/6/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | P | FAIL |
|
|
provide gate valve and bearing plate for the fire hydrant per review notes #6 and #9 8/6/2002 4:15:43 PM
|
FIR02-00010
| INSP-Sprinkler Rough-in/Hydro | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | P | FAIL |
|
|
hydro test for system 2 failed. gauge was at 209 and after two hours was at 207 lbs 8/6/2002 3:08:54 PM
|
BLD02-00064
| FIRE-Final Inspection | 8/5/2002 | 8/6/2002 | 8/6/2002 12:00:00 AM | P | FAIL |
|
|
duct detector not operating correctly. contractor is verifiying that the unit is moving more air than 2,000 cfm to even require the duct detector 8/6/2002 2:04:36 PM
|