Inspections for the day of: Tuesday, August 6, 2002.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR01-00625 INSP-Final Inspection8/2/20028/6/20028/6/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 08/02/2002 at 08:34:54. Contact: .
inspection not done due to no contact number being given. With the site being HP I can't get beyond the security office without a chaperone. 8/6/2002 4:28:13 PM
FIR01-00572 INSP-Final Inspection8/5/20028/6/20028/6/2002 12:00:00 AMAFAIL
transformer still needs to be mechanically secured so it can not be unplugged. 8/6/2002 11:52:50 AM
FIR02-00273 INSP-Sprinkler Rough-in/Hydro8/6/20028/6/20028/6/2002 12:00:00 AMPFAIL
provide gate valve and bearing plate for the fire hydrant per review notes #6 and #9 8/6/2002 4:15:43 PM
FIR02-00010 INSP-Sprinkler Rough-in/Hydro8/5/20028/6/20028/6/2002 12:00:00 AMPFAIL
hydro test for system 2 failed. gauge was at 209 and after two hours was at 207 lbs 8/6/2002 3:08:54 PM
BLD02-00064 FIRE-Final Inspection8/5/20028/6/20028/6/2002 12:00:00 AMPFAIL
duct detector not operating correctly. contractor is verifiying that the unit is moving more air than 2,000 cfm to even require the duct detector 8/6/2002 2:04:36 PM