Inspections for the day of: Wednesday, August 6, 2003.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00090 BLD-Framing/Rough-in8/5/20038/6/20038/7/2003 12:00:00 AMAFAIL
alan for cover; Phone #: ###-#### Internet Inspection Request from: Darla Downs...need listing & install info, product for 2hr expansion joint not as plans show...submit. This is main exp joint thru entire bldg... 8/7/2003 11:56:04 AM
BLD00-03449 BLD-Aging Inspection8/6/20038/6/20038/6/2003 12:00:00 AM PASS
west wing infrastructure...WIP 8/6/2003 4:54:04 PM
BLD02-00266 BLD-Aging Inspection8/6/20038/6/20038/6/2003 12:00:00 AM PASS
WIP... 8/6/2003 11:28:09 AM WIP... statde work complete?? need engs ok for mezz welds8/6/2003 11:28:09 AM 8/6/2003 11:30:19 AM
BLD02-00301 BLD-Aging Inspection8/6/20038/6/20038/6/2003 12:00:00 AM DONE
BLD03-01120 BLD-Conference8/5/20038/6/20038/6/2003 12:00:00 AMAPASS
Carl, can you go by and look at the stairs on this place?,,, may want to call Curt 1st ###-####, let me know or call b-4 you go,, THANKS, ...stairs & frame ok as built, add gyp sheathing at shear walls; ok to insulate. 8/6/2003 11:26:22 AM
BLD03-01120 BLD-Conference8/5/20038/6/20038/6/2003 12:00:00 AMAPASS
Carl, can you go by and look at the stairs on this place?,,, may want to call Curt 1st ###-####, let me know or call b-4 you go,, THANKS, Tony; Stairs and framing ok as built...add gyp shear wall sheathing; ok . 8/6/2003 11:11:11 AM
BLD03-01060 BLD-Conference8/5/20038/6/20038/6/2003 12:00:00 AMAPASS
LARRY; Phone #: ###-#### Internet Inspection Request from: Darla Downs...1hr bldg, need patch gyp & firestop penetrations...may req fire damper at exh duct. ok to cover int partitions pending elec/plbg 8/6/2003 12:03:23 PM
MEC03-02073 Pressure Test8/5/20038/6/20038/6/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 8/5/2003 at 4:18:35 PM. Contact: ###-####....ok, advised to obtain plbg permit, no struct req'd. 8/6/2003 11:18:51 AM
BLD03-01120 BLD-Framing/Rough-in8/5/20038/6/20038/6/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 8/5/2003 at 6:42:12 PM. Contact: ###-####.
BLD03-01163 BLD-Final8/5/20038/6/20038/6/2003 12:00:00 AMANR
Scheduled by a contractor via Hello! on 8/5/2003 at 7:02:27 PM. Contact: ###-####....complete frame item (joist over stairs)...ok to insulate 8/6/2003 10:05:26 AM
BLD02-00370 BLD-Framing/Rough-in8/4/20038/6/20038/6/2003 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 8/4/2003 at 9:43:49 AM.
BLD02-01920 BLD-Final8/4/20038/6/20038/6/2003 12:00:00 AMANR
###-#### eric....need plbg,htg finals 8/6/2003 11:25:01 AM
BLD03-01163 BLD-Framing/Rough-in8/6/20038/6/20038/6/2003 12:00:00 AMPPART
ok to insulatemake correction ok. 8/6/2003 2:52:05 PM
BLD03-00830 BLD-Final8/6/20038/6/20038/6/2003 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung...see c/n , ok for t/o 8/6/2003 6:27:33 PM
BLD03-00985 BLD-Footing8/6/20038/6/20038/6/2003 12:00:00 AMPPART
chris; Phone #: ###-#### Internet Inspection Request from: Barbara Moore...steel in ok 8/6/2003 2:50:12 PM
BLD03-01417 BLD-Framing/Rough-in8/6/20038/6/20038/6/2003 12:00:00 AMPPART
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung plbg, elec ok, partitions ok 8/6/2003 7:11:13 PM
BLD02-00370 BLD-Framing/Rough-in8/6/20038/6/20038/6/2003 12:00:00 AMPPART
ext nailing, east , west side ok, 8/7/2003 11:59:03 AM
BLD02-00090 BLD-Framing/Rough-in8/6/20038/6/20038/6/2003 12:00:00 AMPNR