Inspections for the day of: Wednesday, August 6, 2003.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01071 BLD-Framing/Rough-in8/5/20038/6/20038/6/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 8/5/2003 at 11:43:06 AM. Contact: ###-####. 2 units have c/n. 8/6/2003 5:54:54 PM
BLD03-01071 BLD-Energy code compliance8/5/20038/6/20038/6/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 8/5/2003 at 11:44:37 AM. Contact: ###-####.2 units have c/n. 8/6/2003 5:55:02 PM
MEC03-02089 Final8/5/20038/6/20038/6/2003 12:00:00 AMAPASS
###-#### don
BLD03-01335 BLD-Final8/5/20038/6/20038/6/2003 12:00:00 AMACANC
OFFICE; Phone #: ###-#### Internet Inspection Request from: Darla Downs. needs fire before structural. 8/6/2003 12:02:02 PM
BLD03-01272 BLD-Framing/Rough-in8/5/20038/6/20038/6/2003 12:00:00 AMAFAIL
c/n posetd. 8/6/2003 11:02:40 AM
BLD03-01170 BLD-Framing/Rough-in8/5/20038/6/20038/6/2003 12:00:00 AMAPART
dawnette; Phone #: ###-#### Internet Inspection Request from: Darla Downs 2 iitems in crawl left ok to insulate. 8/6/2003 12:44:40 PM
BLD02-02718 BLD-Framing/Rough-in8/5/20038/6/20038/6/2003 12:00:00 AMPPART
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downs floor joist and top of a chase. 8/7/2003 1:46:24 PMchris; Phone #: ###-#### Internet Inspection Request from: Darla Downs floor joist and top of a chase. 8/7/2003 1:46:28 PM
BLD02-01072 BLD-Framing/Rough-in8/5/20038/6/20038/6/2003 12:00:00 AMPPART
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downschris; Phone #: ###-#### Internet Inspection Request from: Darla Downs floor joist and top of a chase. 8/7/2003 1:46:24 PMchris; Phone #: ###-#### Internet Inspection Request from: Darla Downs floor joist and top of a chase. 8/7/2003 1:46:34 PM
BLD03-00671 BLD-Energy code compliance8/6/20038/6/20038/6/2003 12:00:00 AMPFAIL
###-#### camil .Needs to complete 2 items of prior c/n head height at stairs and 2 beams shown as 3 c/n posted again andalos called buyilder left message to call me back, NOTE: I had meet and went over head height in full detail with builder. 8/6/2003 12:43:36 PM
BLD03-01028 BLD-Framing/Rough-in8/6/20038/6/20038/6/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 8/6/2003 at 8:14:37 AM. Contact: ###-####. Posted a c/n to put back prior c/n also complete insulation prior to a frame inspection. 8/6/2003 1:59:25 PM
BLD03-00706 BLD-Footing8/6/20038/6/20038/6/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 8/6/2003 at 8:29:30 AM. Contact: ###-####.last pour of footing. 8/6/2003 3:19:09 PM
BLD03-00366 BLD-Final8/6/20038/6/20038/6/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/6/2003 at 8:59:33 AM. Contact: ###-####.ok perm oc. 8/6/2003 3:40:16 PM
BLD03-01242 BLD-Final8/6/20038/6/20038/6/2003 12:00:00 AMPFAIL
jack; Phone #: ###-#### Internet Inspection est from: Barbara Moore. nneed landing at rear door and safety glass next to door posted a c/n. 8/6/2003 2:39:19 PM
BLD03-01248 BLD-Framing/Rough-in8/6/20038/6/20038/6/2003 12:00:00 AMPPASS
cole shear nail; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD02-01070 BLD-Framing/Rough-in8/6/20038/6/20038/6/2003 12:00:00 AMPCANC