FIR03-00187
| INSP-Alarm Testing | 7/31/2003 | 8/1/2003 | | A | |
|
|
###-#### daniel
|
FIR03-00427
| INSP-Final Inspection | 8/7/2003 | 8/6/2003 | 8/7/2003 12:00:00 AM | P | PART |
|
|
performed inspection from 5-8:30 pm; NAC in basement not sync'd; horn in VIP not temporal; need to verify batteries and voltage drops
|
FIR03-00225
| FIR-Aging Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | | PASS |
|
|
the BLD permit and FIR alarm permit aren't ready for final yet; SL construction will need to make sure plans are available at final 8/6/2003 8:06:27 AM
|
FIR03-00315
| INSP-Final Inspection | 8/5/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 9:53:09 AM. Contact: ###-####. this permit was called in by mistake by another contractor 8/6/2003 9:52:32 AM
|
FIR03-00070
| INSP-Final Inspection | 8/5/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 9:55:05 AM. Contact: ###-####. this a phased project; phase 1okay; NAC's will be per plans after phase two 8/6/2003 12:33:44 PM
|
FIR03-00434
| INSP-Sprinkler Rough-in | 8/5/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | A | PART |
|
|
office underground; Phone #: ###-#### Internet Inspection Request from: Darla Downs stub out okay; thrust block at base of riser okay; need to complete rest of UG to UW tie in 8/6/2003 9:50:58 AM
|
BLD03-01769
| FIRE-Final Inspection | 8/5/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | A | FAIL |
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Darla Downs store front door hardware to be openable from the inside without special knowledge; duct detectors are required for HVAC units for unit shutdown; the HVAC units weren't modified for this building permit; the panel is an FCI with what appears to be a free zone for the new detectors; the exsisting FACP will require a map; there is a smoke above the panel and a pull station in the riser/FACP room; horn is in this new permitted space 8/6/2003 10:48:46 AM
|
FIR03-00336
| INSP-Final Inspection | 8/5/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/5/2003 at 7:05:58 PM. Contact: ###-####.
|
BLD03-00830
| FIRE-Final Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungtemp occ approvede per Dave Miller pending resolution of fire sprinklers; need to complete emergency lighting in north hall; complete alarm per latest review 8/7/2003 9:21:19 AM
|
FIR03-00434
| INSP-Sprinkler Rough-in/Hydro | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 8/6/2003 at 9:27:04 AM. Contact: ###-####. okay to cover the UG; still need hydro and flush 8/6/2003 1:10:02 PM
|
FIR03-00192
| INSP-Sprinkler Rough-in | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | PART |
|
|
test; Phone #: ###-#### Internet Inspection Request from: Linda Hartwell hydro okay; sprinkler system needs annual inspection; needs knox box and signs on door to sprinkler controls 8/7/2003 9:22:24 AM
|
FIR03-00315
| INSP-Final Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | CANC |
|
|
wrong permit added by inspector 409 8/6/2003 11:06:51 AM
|
BLD03-00315
| FIRE-Final Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | PASS |
|
|
verfied damper operation - okay; penetrations fire stopped at walls and at new wall for new doors 8/6/2003 12:31:59 PM
|
FIR03-00259
| INSP-Final Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00225
| INSP-Final Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | PASS |
|
|
|
BLD02-02815
| FIRE-Final Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | PART |
|
|
data entry and soiled linen area to west aren't completed as part of this phase; alarms and sprinklers are okay for this phase 8/6/2003 12:37:29 PM
|
FIR03-00039
| INSP-Final Inspection | 8/6/2003 | 8/6/2003 | 8/6/2003 12:00:00 AM | P | PASS |
|
|
this portion of the BLD permit complete; need submittals for the next phase
|