Inspections for the day of: Friday, August 6, 2004.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00208 BLD - Request for Extension8/5/20048/6/20048/6/2004 12:00:00 AM PASS
still working on this project.....###-#### randy or stacy
ok to extend 8/5/2004 2:35:17 PM
BLD03-02368 BLD-Final8/5/20048/6/20048/6/2004 12:00:00 AMAPASS
jock ###-####
BLD04-01369 BLD-Energy code compliance8/5/20048/6/20048/6/2004 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 8/5/2004 at 11:55:04 AM. Contact: ###-####. canc inspection 8:40 am
BLD04-00543 BLD-Framing/Rough-in8/5/20048/6/20048/6/2004 12:00:00 AMAPASS
ralph; Phone #: ###-#### Internet Inspection Request from: Annette Moore
ext. ok also,,, ok to insulate 8/6/2004 2:21:25 PM
BLD04-01026 BLD-Framing/Rough-in8/5/20048/6/20048/6/2004 12:00:00 AMAPART
Mark; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
ok to insulate,,, check fan ducts at energy code 8/6/2004 11:06:23 AM
BLD02-00421 BLD-Conference8/5/20048/6/20048/6/2004 12:00:00 AMAPASS
Monica; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
MEC04-01990 Rough-in8/5/20048/6/20048/6/2004 12:00:00 AMAPASS
BLD04-01622 BLD-Footing8/5/20048/6/20048/6/2004 12:00:00 AMAPART
kerry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC04-00116 Final8/5/20048/6/20048/6/2004 12:00:00 AMADONE
BLD03-01615 BLD-Conference8/4/20048/6/20048/6/2004 12:00:00 AMPPART
bill ###-####
front stair issues 8/6/2004 2:39:11 PM
BLD04-01369 BLD-Framing/Rough-in8/6/20048/6/20048/6/2004 12:00:00 AMPCANC
###-#### - paul
BLD03-02732 BLD-Final8/6/20048/6/20048/6/2004 12:00:00 AMPPASS
michelle; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD04-01639 BLD-Footing8/6/20048/6/20048/6/2004 12:00:00 AMPFAIL
steve; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
c/n posted,, need letter from structural engineer or soil engineer on compaction of, or letter of OK that the soil that ftgs were poured on are ok for design of structure,,, footing was poured on back fill on rear portion of structure without disclosing to me,,, possible 6ft deep, looking for sewer line?
no more work is allowed until approval from building dept./inspector 8/6/2004 3:24:31 PM
BLD02-00421 BLD-Final8/6/20048/6/20048/6/2004 12:00:00 AMPPASS
MEC03-02946 Final8/6/20048/6/20048/6/2004 12:00:00 AMPPASS
MEC04-02012 Rough-in8/6/20048/6/20048/6/2004 12:00:00 AMPPASS
BLD04-00702 BLD-Foundation8/5/20048/6/20048/6/2004 12:00:00 AMPCANC
Dan;Phone####-#### 8/5/2004 3:06:39 PM
BLD04-00702 BLD-Foundation8/5/20048/6/20048/6/2004 12:00:00 AMPCANC
Dan;Phone####-#### 8/5/2004 3:06:39 PM
BLD04-00702 BLD-Foundation8/5/20048/6/20048/6/2004 12:00:00 AMPCANC
Dan;Phone####-#### 8/5/2004 3:06:39 PM
BLD03-02022 BLD-Energy code compliance8/5/20048/6/20048/6/2004 12:00:00 AMPPASS
tom; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD02-00421 BLD-Final8/5/20048/6/20048/5/2004 4:10:48 PMPCANC
monica; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Inspection cancelled from web by: Aimee Hughes