FIR04-00377
| INSP-Alarm Testing | 8/4/2004 | 8/6/2004 | 8/6/2004 12:00:00 AM | A | FAIL |
|
|
Provide approved door hardware on doors marked on drawing sheet A1.1. Provide exit discharge illumination per building review notes #22. Install ceiling tile at sprinkler pendants. Test duct detectors. Relocate ducting at duct detector #1. Provide 30cd strobes in rooms as marked on plans and measure EOL voltage. Provide map at FACP 8/6/2004 1:57:55 PM
|
FIR04-00377
| INSP-Final Inspection | 8/5/2004 | 8/6/2004 | 8/6/2004 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/5/2004 at 10:34:50 AM. Contact: ###-####.
|
BLD04-00705
| FIRE-Final Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 12:00:00 AM | P | PASS |
|
|
Fire life safety finaled 8/6/2004 1:40:34 PM
|
FIR04-00238
| INSP-Conference | 8/6/2004 | 8/6/2004 | 8/6/2004 12:00:00 AM | P | DONE |
|
|
I stopped at the project per Mary's request to verify if fire alarm work had been started without approved drawings. I found backboxes and conduit installed but no wiring. Per Andy Lieurance, the electrician that installed the boxes, who is with Romar, the boxes where installed during rough-in and he was then told to quit installing since it was FutureTechs job to install. I will talk to Dave Miller on Monday to verify that a citation will be issued. According to city records Romar has received two precitation letter already.
|
FIR04-00238
| INSP-Conference | 8/6/2004 | 8/6/2004 | 8/6/2004 12:00:00 AM | P | DONE |
|
|
I issued a stop work order for the fire alarm installation. Notice is posted on the southeast facing door
|
BLD03-02403
| FIRE-Conference | 8/6/2004 | 8/6/2004 | 8/6/2004 12:00:00 AM | P | DONE |
|
|
I issued a stop work order for the fire alarm installation. Notice is posted on the southeast facing door
|
BLD04-00495
| FIRE-Final Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 12:00:00 AM | P | FAIL |
|
|
Provide approved door hardware on doors marked on drawing sheet A1.1. Provide exit discharge illumination per building review notes #22. Install ceiling tile at sprinkler pendants. Test duct detectors. Relocate ducting at duct detector #1. Provide 30cd strobes in rooms as marked on plans and measure EOL voltage. Provide map at FACP
|
FIR04-00268
| INSP-Final Inspection | 8/6/2004 | 8/6/2004 | 8/6/2004 12:00:00 AM | P | PASS |
|
|
Sprinkler permit finaled
|