Inspections for the day of: Friday, August 6, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00377 INSP-Alarm Testing8/4/20048/6/20048/6/2004 12:00:00 AMAFAIL
Provide approved door hardware on doors marked on drawing sheet A1.1. Provide exit discharge illumination per building review notes #22. Install ceiling tile at sprinkler pendants. Test duct detectors. Relocate ducting at duct detector #1. Provide 30cd strobes in rooms as marked on plans and measure EOL voltage. Provide map at FACP 8/6/2004 1:57:55 PM
FIR04-00377 INSP-Final Inspection8/5/20048/6/20048/6/2004 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 8/5/2004 at 10:34:50 AM. Contact: ###-####.
BLD04-00705 FIRE-Final Inspection8/6/20048/6/20048/6/2004 12:00:00 AMPPASS
Fire life safety finaled 8/6/2004 1:40:34 PM
FIR04-00238 INSP-Conference8/6/20048/6/20048/6/2004 12:00:00 AMPDONE
I stopped at the project per Mary's request to verify if fire alarm work had been started without approved drawings. I found backboxes and conduit installed but no wiring. Per Andy Lieurance, the electrician that installed the boxes, who is with Romar, the boxes where installed during rough-in and he was then told to quit installing since it was FutureTechs job to install. I will talk to Dave Miller on Monday to verify that a citation will be issued. According to city records Romar has received two precitation letter already.
FIR04-00238 INSP-Conference8/6/20048/6/20048/6/2004 12:00:00 AMPDONE
I issued a stop work order for the fire alarm installation. Notice is posted on the southeast facing door
BLD03-02403 FIRE-Conference8/6/20048/6/20048/6/2004 12:00:00 AMPDONE
I issued a stop work order for the fire alarm installation. Notice is posted on the southeast facing door
BLD04-00495 FIRE-Final Inspection8/6/20048/6/20048/6/2004 12:00:00 AMPFAIL
Provide approved door hardware on doors marked on drawing sheet A1.1. Provide exit discharge illumination per building review notes #22. Install ceiling tile at sprinkler pendants. Test duct detectors. Relocate ducting at duct detector #1. Provide 30cd strobes in rooms as marked on plans and measure EOL voltage. Provide map at FACP
FIR04-00268 INSP-Final Inspection8/6/20048/6/20048/6/2004 12:00:00 AMPPASS
Sprinkler permit finaled