MIS09-00126
| BLD-Final | 8/6/2009 | 8/6/2009 | 8/6/2009 2:55:37 PM | P | PASS |
|
|
Scott Phone #: ###-####
|
MIS09-00126
| DOC - Permit Finaled | 8/6/2009 | 8/6/2009 | 8/6/2009 2:55:25 PM | P | PASS |
|
|
Letter of compliance issued.
|
BLD09-01246
| BLD-Footing | 8/6/2009 | 8/6/2009 | 8/6/2009 1:53:28 PM | P | PART |
|
|
Jay Phone #: ###-####
|
ESC09-00474
| Site Preparation | 8/6/2009 | 8/6/2009 | 8/6/2009 1:53:08 PM | P | FAIL |
|
|
No ESC sign posted. No concrete washout noted. Needs to sweep all hard surfaces of sediment. No BMP's. RP was notified by verbal c/n over phone. No concrete is allowed until issues have been resolved.
|
ESC09-00440
| Random Inspection | 8/6/2009 | 8/6/2009 | 8/6/2009 9:58:01 AM | A | PASS |
|
|
|
BLD09-01164
| BLD-Framing/Rough-in | 8/5/2009 | 8/6/2009 | 8/6/2009 9:57:52 AM | A | PASS |
|
|
pat Phone #: ###-####
|