PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, August 6, 2009
.
Number of inspections:
13
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC07-00987
BMP Violation
8/6/2009
8/6/2009
8/6/2009 4:55:53 PM
P
PASS
All issues from the prior day have been corrected and protected.
ESC08-00491
General Inspection
8/6/2009
8/6/2009
8/6/2009 4:55:05 PM
P
PART
Discussed with Epstien over no discharge from turbid water is allowed off site with out special provisions. Was told that they will be installing a head gate at the V cut at the out fall at the basin at the South west end of the project area.
ESC08-00660
General Inspection
8/6/2009
8/6/2009
8/6/2009 3:55:38 PM
PASS
ESC09-00407
BMP Violation
8/4/2009
8/6/2009
8/6/2009 3:41:08 PM
A
FAIL
Stop Work Order Posted. See inspection record.
ESC09-00407
INSP - Stop Work Order
8/6/2009
8/6/2009
8/6/2009 3:39:49 PM
P
FAIL
Verbal to RP:
STOP WORK ORDER.
1. Protect Storm Drain to the west of lot.
2. Install sediment barriers along the stock piles.
Must call for a re-inspection to have Stop Work Order lifted once all issues are corrected.
ESC09-00067
Site Preparation
8/6/2009
8/6/2009
8/6/2009 2:47:50 PM
NR
ESC09-00457
Site Preparation
8/6/2009
8/6/2009
8/6/2009 11:50:13 AM
PASS
ESC08-00952
Complaint Inspection
8/5/2009
8/6/2009
8/6/2009 11:37:22 AM
A
FAIL
Message to RP:
1. Explained to RP that a Construction Exit constructed with crushed basalt rock 4-8 inches depth with a geotextile fabric underneath the rock. This will meet the Erosion Control requirement and also the Fire code requirements. Must occur by the end of the day 8/6/09. Will reinspect on 8/7/09 AM
ESC09-00306
Site Preparation
8/6/2009
8/6/2009
8/6/2009 10:09:45 AM
NR
Will re-inspect in 1 week.
ESC08-00102
BMP Violation
8/6/2009
8/6/2009
8/6/2009 9:51:08 AM
A
PART
All issues corrected prior to the inspection being complete.
ESC09-00486
Site Preparation
8/6/2009
8/6/2009
8/6/2009 9:06:19 AM
PART
Need to install a concrete washout prior to pour date of footings.
ESC09-00325
Site Preparation
8/6/2009
8/6/2009
8/6/2009 9:03:21 AM
PASS
Will inspect through out duration of project.
ESC09-00480
Site Preparation
8/6/2009
8/6/2009
8/6/2009 8:21:50 AM
NR