FIR06-00088
| FIR-Aging Inspection | 8/6/2010 | 8/6/2010 | 8/10/2010 2:08:29 PM | | FAIL |
|
|
|
FIR10-00207
| FIR-Aging Inspection | 8/6/2010 | 8/6/2010 | 8/10/2010 2:05:25 PM | | DONE |
|
|
|
BLD10-00992
| FIRE-Final Inspection | 8/5/2010 | 8/6/2010 | 8/6/2010 3:46:32 PM | A | FAIL |
|
|
Provide approved door hardware at 105B, post tactile exit sign per plan notes #18, scope of work at the 1st floor is incomplete-discussed possible plan modification with contractor.
|
BLD10-01326
| FIRE-Final Inspection | 8/5/2010 | 8/6/2010 | 8/6/2010 3:43:35 PM | P | PASS |
|
|
Fire life safety passed inspection.
|
FIR10-00333
| INSP-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 3:43:00 PM | P | PASS |
|
|
Corrections field verified, fire sprinkler permit final approved.
|
FIR10-00381
| INSP-Final Inspection | 8/5/2010 | 8/6/2010 | 8/6/2010 3:34:09 PM | P | PASS |
|
|
Inspection passed, fire alarm permit finaled.
|
BLD10-00831
| FIRE-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 1:26:43 PM | P | FAIL |
|
|
Corrections items include; repair one exit sign, one EM light and provide directional arrow at one exit sign per plan on the third floor. Repair one exit/EM light at the second floor. Scope of work per the permit description for the new exit discharge at the ground floor SW corner has not been done, item #15 per the fire code review is not yet provided.
|
BLD10-00288
| FIRE-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 1:12:48 PM | A | NR |
|
|
Pending project related fire alarm permit FIR10-00293 and note #4 per fire code review comments.
|
BLD10-00960
| FIRE-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 1:11:01 PM | P | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR10-00294
| INSP-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 1:08:39 PM | P | PASS |
|
|
Corrections finished, reinspection passed. Tenant fire alarm permit final approved.
|
FIR10-00293
| INSP-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 1:06:30 PM | P | NR |
|
|
No test performed due to non-functional elevator.
|
FIR10-00295
| INSP-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 1:04:25 PM | P | PASS |
|
|
Remainder of the scope of work and C/N items finished while on site and verified for completion. Fire sprinkler permit finaled.
|
FIR10-00290
| INSP-Final Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 1:02:30 PM | P | PASS |
|
|
Re-inspection for correction items passed, dry system pressure switch reset repaired by sprinkler contractor, fire alarm permit final okayed.
|
FIR10-00295
| INSP-Sprinkler Rough-in/Hydro | 8/5/2010 | 8/6/2010 | 8/6/2010 12:58:49 PM | A | PART |
|
|
Reinspection for previous correction items completed acceptable. However, noted fire sprinkler work at the third floor per plan had not been done, also missing an escutcheon at the first floor lobby.
|
FIR10-00006
| INSP-Alarm Testing | 7/14/2010 | 8/6/2010 | 8/6/2010 12:00:00 AM | A | CANC |
|
|
Dan ###-####
|