Inspections for the day of: Friday, August 6, 2010.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00214 Site Preparation8/6/20108/6/20108/12/2010 1:41:43 PM PART
Need to post ESC sign where visable from the street.
ESC10-00518 Site Preparation8/6/20108/6/20108/6/2010 3:02:12 PM FAIL
Message to RP:
Provide sediment barrier along the perimeter the drainage pond. Where the area was excavated out for the concrete washout provide a sediment barrier. Also prior to any storm event, provide a sediment barrier along the driveway access of the lot to prevent sheet flow. Will re-inspect on 8/9/10am.
ESC10-00584 Site Preparation8/6/20108/6/20108/6/2010 10:32:45 AM PASS
ESC10-00536 Site Preparation7/30/20108/6/20108/6/2010 9:43:39 AMANR
ESC10-00013 General Inspection ESC8/6/20108/6/20108/6/2010 8:39:38 AM PASS
ESC10-00390 Site Preparation8/6/20108/6/20108/6/2010 8:29:06 AM NR
Work will begin at the end of the month. Will re-inspect with the RP to review the SWPPP and project conditions.